My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1722 W MARINE VIEW DR WOODFIRE GRILL 2019-03-28
>
Address Records
>
W MARINE VIEW DR
>
1722
>
WOODFIRE GRILL
>
1722 W MARINE VIEW DR WOODFIRE GRILL 2019-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 10:04:38 AM
Creation date
3/28/2019 10:04:31 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1722
Tenant Name
WOODFIRE GRILL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIPING FROST RAIL SYSTEM: <br /> 1 ) . Refrigeration Tech - PLEASE FOLLOW DRAWINGS. <br /> 2) . Line sizes - 1 /2" Liquid and 5/8" Suction lines with 3/4" <br /> thickness insulation on suction line. <br /> 3) . maximum run with one ICE-75 units <br /> 4) . Do not on copper lines that are passing <br /> through the bar top. This will create dead spots at <br /> the joints of the FRails. <br /> 5) . There is not a correct direction for the refrigeration <br /> circuit in the FRails - in and out does not matter. <br /> However, if you feed the circuit on the left side, stay <br /> consistent with all the circuits. <br /> 6) . Position TXV so that feeder tuoes are the same <br /> length. Never cut excess lines coming off the <br /> distributor, simply coil up any extra copoer. <br /> 7) . TXV bulbs needs to be strapped tight, horizontally <br /> at the _ ievei or one o'ciocK position. <br /> 8) . Place the TXV bulb as located on the drawings. You <br /> do not want to place the bulb in a position where <br /> another circuit can influence the circuit that we are <br /> trying to control. <br /> 9). Insulate all suctior lines using 1/4" wall thickness <br /> insulation and use foam insulation tape between <br /> sections and under bar areas. <br /> 10) . If the Refrigeration Unit is mounted above the Frost <br /> Rail, a Refrigeration "P-TRAP is required every 8' of <br /> lift on the Suction Line. <br /> /3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.