My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 3/22/2019 Amendment 3
>
Contracts
>
6 Years Then Destroy
>
2020
>
HDR Engineering Inc 3/22/2019 Amendment 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 9:17:56 AM
Creation date
4/2/2019 9:17:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
3/22/2019
Council Approval Date
3/20/2019
End Date
3/31/2020
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
WO3614
Amendment/Change Order
Amendment
Amendment/Change Order Number
3
Total Compensation
$1,386,809.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 'A' <br /> HWA GEOSCIENCES INC. <br /> a.trelrrtc,rl <br /> renvin,m1L,•grn,rrmg t(rden/r•qi •{«,. rrruu+nrenra(•/mprrrtou,i Ir.rurr; <br /> September 18,2018 <br /> HWA Project No.2015-067-21 Task 400 <br /> HDR Inc. <br /> 500 108th Avenue NE, Suite 1200 <br /> Bellevue,Washington 98004-5549 <br /> Attention: Jeffrey Zahller,P.E. <br /> Subject: PROPOSAL FOR GEOTECHNICAL ENGINEERING SERVICES <br /> WPCF FEN PHASE 2 <br /> Everett,Washington <br /> Dear Jeffrey: <br /> As requested,HWA GeoSciences Inc. (HWA)is pleased to present this scope of work to provide <br /> additional geotechnical engineering services for the construction of Phase 2 of the Final Effluent <br /> North Facility Improvements project at the City of Everett's WPCF. <br /> HWA provided a scope and budget to provide geotechnical services during construction on April <br /> 18,2017. The provided scope was developed during the design phase and was based on our <br /> knowledge about the project to that date. The scope did not include observation of the proposed <br /> dike construction. Additionally,the scope assumed 2 days of test pile driving and 20 days of <br /> production piles driving,updated information and schedule for the project shows more days that <br /> we assumed initially. Therefore,this additional scope and budget to provide geotechnical <br /> services during construction includes the additional work not added in our previous scope. <br /> PHASE 2—TASK 400 <br /> Construction Services <br /> HWA will provide construction services in support of Phase 2 of the design of the FEN <br /> improvements.This work will include the following subtasks. <br /> • Geotechnical Related Submittal Review: HWA will review RFI related to geotechnical <br /> aspect of the construction. <br /> • Geotechnical Observation during Dike Construction: (10 days assumed)-An HWA <br /> representative will provide full observation during construction of the proposed dike. <br /> This work will not include compaction testing. It is our understanding <br /> that the Cityis goingto verifycompaction levels. <br /> 21312 30µDrive SE <br /> P Suite 110 <br /> Bothell,WA 98021.7010 <br /> Tel:425.774.0106 <br /> Fax:425374.2714 <br /> www.hwageo.com <br /> Federal&State Certified <br /> DBE/MWBE <br />
The URL can be used to link to this page
Your browser does not support the video tag.