September 18,2018 <br /> HWA Project No. 2015-067-21 —Phase 2 <br /> • Test Pile Monitoring and Evaluation:HWA added two additional days of test pile <br /> driving per project schedule(to account for spaced location of test piles). Following the <br /> driving of test piles,a letter will be prepared recommending pile driving criteria. <br /> • Monitoring the Installation of Foundation Piles--HWA added five additional days <br /> of production pile driving per project schedule. <br /> • Task Management: HWA will prepare monthly invoices,and progress reports,if <br /> required. We will correspond with the City of Everett and HDR in emails,fax,and <br /> telephone calls,as necessary. <br /> Assumptions: <br /> • HWA will provide daily field report for all geotechnical observation activities. <br /> • This is an estimate based on the perceived requirements of the project. The work will <br /> be performed on an on-call,time-and-expense basis. The actual cost will depend on <br /> the Contractor's rate of progress, conditions encountered,weather,and other factors <br /> beyond our control. <br /> • Compaction testing will not be required. <br /> • Weekend or night work will not be required <br /> Deliverables: <br /> • Daily Field Reports <br /> • Final Report <br /> 0.0 <br /> We appreciate the opportunity to provide geotechnical services on this project. Please feel free <br /> to call if you have any questions or need additional information. <br /> Sincerely, <br /> HWA GEOSCIENCES INC. <br /> J f_ <br /> Sandy Ramos Brodahl,P.E. <br /> Geotechnical Engineer,Principal <br /> Enclosure: Job Cost Estimate <br /> HWA Scope of Work-Add Construction 2 HWA GeoSciences Inc. <br />