Laserfiche WebLink
COST ESTIMATE FOR GEOTECHNICAL SERVICES HWA Ref: 2015-067-21 T400 <br /> WPCF FEN IMPROVEMENTS-PHASE 2 Date: 18-Sep-2018 <br /> EVERETT,WASHINGTON Prepares for: HDR <br /> Prepared By: SRB <br /> PROPOSED SCOPE: <br /> Please refer to the accompanying scope of work_ <br /> ESTIMATED HWA LABOR FOR PHASE 2 TASK 300 <br /> PERSONNEL AND 2018 HOURLY RATES <br /> Geotechnical Geotechnical i Geotechnical <br /> WORK TASK Principal IX Engineer VI Enginu:r IV Engineer I _Geolo&ist U CAD Clerical TOTAL. DIRECT LABOR <br /> DESCRIPTION 584.62 $580C $46.00 $32,69 $29_00 538.00 $23.00 HOURS AMOUNT <br /> Taper �Services i i I 1 1 <br /> Geotechnical Related Submittal Review 2 4 6 $353 <br /> Geotechnical Observation dunng Dike Construction t 1 0 days) 2 10_ 100 112 S3.898 <br /> Test Pile Observation and Evaluation(2 additional days) 1 12 12 25 S1,029 <br /> Geotrchnicai Or <br /> bsvanon dunng Production Diiieo Pile _ _ - — -' <br /> Insiallanon-Outfall Structure and Generator Slab (5 days) 1 5 50 56 S1,949 <br /> Task Management 15 15 _ $690 <br /> DIRECT LABOR: 6 0 46 162 0 0 0 214 57,920 <br /> HWA LABOR COSTS ESTIMATED DIRECT EXPENSES <br /> Direct Satan Cost(DSC) $7,920 Drilling Subcontractor Cost _ $0 <br /> Overhead(OH)@a 198.65%of DSC $15,732_ Mileage(IRS Rate)/Misc _ $410 <br /> Fixed Fee Q 30%of DSC $2,376 Total Direct Expenses: J 5410 <br /> 526.027.. <br /> PROJECT TOTALS AND SUMMARY <br /> Note(Task 400): HWA Labor _ $26,027 <br /> This is an estimate based on the perceived requirements of the project Direct Expenses _ 5410 <br /> The work will be performed on an on-call,time-and-expense basis. TOTAL ESTIMATED COST: J $26,437 <br /> The actual cost will depend on the Contractor's rate of progress, <br /> conditions encountered,weather,and other factors beyond our control. <br /> Everett WPCF FEN Construction Page 1 of 1 HWA GeoSciences Inc. <br />