My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 3/22/2019 Amendment 3
>
Contracts
>
6 Years Then Destroy
>
2020
>
HDR Engineering Inc 3/22/2019 Amendment 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 9:17:56 AM
Creation date
4/2/2019 9:17:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
3/22/2019
Council Approval Date
3/20/2019
End Date
3/31/2020
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
WO3614
Amendment/Change Order
Amendment
Amendment/Change Order Number
3
Total Compensation
$1,386,809.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Client Responsibilities <br /> 1. No further changes to the original scope of work. <br /> Assumptions <br /> 1. No further changes to the original scope of work. <br /> 2. This amendment closes this task in its entirety. <br /> Deliverables <br /> 1. 50% level drawings per City's CAD standards. <br /> Task 1200 90% Design Services <br /> Objective <br /> 1. Advance the design to the 90%design level. <br /> 2. Prepare Engineer's Opinion of Probable Construction Cost(OPCC) at the 90% design level. <br /> HDR Services <br /> 1. HDR produced an additional design sheet to accommodate a late relocation of the standby <br /> generator. This included review by the geotechnical engineer(HWA Geosciences). <br /> 2. HDR conducted a review of a potential move of the chlorine building to a different location <br /> onsite. This exercise was estimated at approximately 100 hours for all disciplines, including <br /> the geotechnical engineer. <br /> Client Responsibilities <br /> 1. No further changes to the original scope of work. <br /> Assumptions <br /> 1. No further changes to the original scope of work. <br /> 2. This amendment closes this task in its entirety. <br /> Deliverables <br /> 1. One additional drawing for relocation of generator. <br /> 2. Email communication of review findings for building relocation. <br /> Task 1300 Final Design Services <br /> This amendment closes this task in its entirety and reallocates remaining budget. <br /> Task 1400 Bidding Support <br /> Objective <br /> Provide assistance to the City throughout the bidding process. <br /> City of Everett—WPCF FEN Amendment No.4 3 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.