Laserfiche WebLink
Client Responsibilities <br /> 1. No further changes to the original scope of work. <br /> Assumptions <br /> 1. No further changes to the original scope of work. <br /> 2. This amendment closes this task in its entirety. <br /> Deliverables <br /> 1. 50% level drawings per City's CAD standards. <br /> Task 1200 90% Design Services <br /> Objective <br /> 1. Advance the design to the 90%design level. <br /> 2. Prepare Engineer's Opinion of Probable Construction Cost(OPCC) at the 90% design level. <br /> HDR Services <br /> 1. HDR produced an additional design sheet to accommodate a late relocation of the standby <br /> generator. This included review by the geotechnical engineer(HWA Geosciences). <br /> 2. HDR conducted a review of a potential move of the chlorine building to a different location <br /> onsite. This exercise was estimated at approximately 100 hours for all disciplines, including <br /> the geotechnical engineer. <br /> Client Responsibilities <br /> 1. No further changes to the original scope of work. <br /> Assumptions <br /> 1. No further changes to the original scope of work. <br /> 2. This amendment closes this task in its entirety. <br /> Deliverables <br /> 1. One additional drawing for relocation of generator. <br /> 2. Email communication of review findings for building relocation. <br /> Task 1300 Final Design Services <br /> This amendment closes this task in its entirety and reallocates remaining budget. <br /> Task 1400 Bidding Support <br /> Objective <br /> Provide assistance to the City throughout the bidding process. <br /> City of Everett—WPCF FEN Amendment No.4 3 Scope of Services <br />