My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 3/22/2019 Amendment 3
>
Contracts
>
6 Years Then Destroy
>
2020
>
HDR Engineering Inc 3/22/2019 Amendment 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 9:17:56 AM
Creation date
4/2/2019 9:17:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
3/22/2019
Council Approval Date
3/20/2019
End Date
3/31/2020
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
WO3614
Amendment/Change Order
Amendment
Amendment/Change Order Number
3
Total Compensation
$1,386,809.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 700 SR07 and SR08 Model Analysis <br /> This amendment closes this task in its entirety and reallocates remaining budget. <br /> Task 800 Project Management — Phase 2 <br /> Objective <br /> The purpose of this task is to monitor, control and adjust scope, schedule, and budget as well <br /> as provide monthly status reporting, accounting, and invoicing for an additional 12 months of the <br /> contract <br /> HDR Services <br /> 1. Continuation of original scope of work(see original SOW). <br /> Client Responsibilities <br /> 1. Communicate scope needs and authorize services as needed. <br /> Assumptions <br /> 1. This amendment increases the project duration by 12 months. <br /> 2. This amendment includes increase of fee increased based on services performed to date. <br /> Deliverables <br /> 1. Continuation of original scope of work. <br /> Task 900 Geotechnical Support <br /> This amendment closes this task in its entirety and reallocates remaining budget. <br /> Task 1000 Permit Acquisition & Environmental Support <br /> This amendment reallocates half of task fee. <br /> Task 1100 50% Design Services <br /> Objective <br /> 1. Advance the design to the 50%design level. <br /> 2. Prepare Engineer's Opinion of Probable Construction Cost(OPCC)at the 50% design level. <br /> 3. Prepare Engineering Report for submittal to the Department of Ecology(DOE). <br /> HDR Services <br /> 1. The original scope required the use of HDR CAD standards. During the early stages of <br /> design, the City requested that HDR use the City's standard and utilize Sheet Set Manager. <br /> This task incorporates the costs associated with CAD staff complying with the required CAD <br /> standards over the course of the design work. <br /> City of Everett—WPCF FEN Amendment No.4 2 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.