1 <br /> 1 <br /> ARTICLE 1 GENERAL INFORMATION <br /> 1.1 Definitions of Words and Terms <br /> A. Where used in the Contract Documents, the following words and terms shall have the meanings indicated. <br /> The meanings shall be applicable to the singular,plural,masculine and feminine of all words and terms. <br /> 1. Addenda: Written or graphic instruments issued prior to the opening of Bids that clarify, correct, or <br /> ' change the Bidding Requirements or the proposed Contract Documents. <br /> 2 Additive: A supplemental unit of work or group of bid items, identified separately in the Bid Form, <br /> that may,at the discretion of the City,be awarded in addition to the base Bid. <br /> ' 3. Alternative or Alternate: One of two or more units of Work or groups of bid items, identified <br /> separately in the Bid Form, from which the City may make a choice between different methods or <br /> material of construction for performing the same Work. <br /> ' 4. Application for Payment: Form acceptable to Owner that Contractor is to use during the course of <br /> the Work in requesting progress or final payments that is to be accompanied by such supporting <br /> documentation as is required by the Contract Documents. <br /> 5. Architect: An individual or entity retained by the Owner to be the Owners representative with regard <br /> to matters of design intent. The terms "Owner's Representative", "Engineer" and "Architect" are <br /> interchangeable. <br /> 6. Award Date: The date of the formal action by the Everett City Council to accept the lowest <br /> responsible and responsive Bidder for the Work. <br /> 7. Bid: The offer or proposal of a bidder submitted on the prescribed form setting forth the prices for the <br /> Work to be performed. <br /> 8. Bid Opening Date: The date the Everett City Clerk publicly opens and reads the Bids. <br /> 9. Change Order: Reference to Change Order shall include all rights of the Owner and Contractor <br /> under ARTICLE 6. CHANGES. <br /> 10. Completion Date: Date on which Project is ready for Final Acceptance. All physical Work, <br /> ' including Punch List, is complete and Contractor has completed and fulfilled all contractual <br /> obligations except any maintenance of landscaping. Contractual obligations that must be fulfilled <br /> prior to achievement of the Completion Date include, but are not limited to, the Contractor's <br /> furnishing all documentation (including correct, complete and accurate as-built or record drawings) <br /> and operation and maintenance manuals and transfer of warranties. <br /> 11. Contract: Agreement signed by the Owner and Contractor(DOCUMENT 00 60 13). Depending on <br /> context, "Contract"may also refer to the Contract Documents as a whole. <br /> 12. Contract Claim: Any request by the Contractor for additional time or money (adjustment of <br /> Contract Sum or Contract Time) irrespective of the cause or reason for the request. Contract Claims <br /> include, but are not limited to, requests by the Contractor for additional time or money due to Extra <br /> ' Work, inefficiencies, Delays, interferences, and problems with the design. Contract Claim includes, <br /> but is not limited to, claims or requests by Subcontractors for extensions of Contract Time, adjustment <br /> of Contract Sum, additional compensation that the Contractor attempts to pass through or assert <br /> against the Owner, or claims against the Owner arising out of a third party's claim against the <br /> Contractor. <br /> 13. Contract Sum: The price in dollars stated in the Contract to be paid by the Owner to the Contractor <br /> ' for the Work described in the Contract Documents,as modified by any Change Orders. <br /> 14. Contract Time: The duration of the Project as stated in the Contract and as modified by any Change <br /> Orders. <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> 00 72 13-5 Issue for Bid <br />