Laserfiche WebLink
i <br /> 15. Contractor: The individual or entity with whom Owner has entered into the Agreement. <br /> 16. Day: Calendar day, unless explicitly stated otherwise. <br /> 17. Delay: Any increase of the duration of the critical path of the Project. <br /> 18. Dispute: Any controversy or disagreement. <br /> 19. Drawings: That part of the Contract Documents that graphically shows the scope, extent, and <br /> character of the Work to be performed by Contractor. Shop Drawings and other Contractor <br /> Submittals are not Drawings as so defined. <br /> 20. Effective Date of Agreement: See 18.10 Effective Date. , <br /> 21. Engineer: An individual or entity retained by the Owner to be the Owners representative with regard <br /> to matters of design intent. The terms "Owner's Representative", "Engineer" and "Architect" are <br /> interchangeable. ' <br /> 22. Equipment: Mechanical, electrical, instrumentation, or other devices with one or more moving parts, <br /> or devices requiring an electrical,pneumatic,electronic,or hydraulic connection. <br /> 23. Extended Overhead: The increase in Overhead costs attributable to an extension of Contract Time. <br /> 24. Extra Work: Providing materials and Equipment and the performance of Work not directly called for <br /> in, or implied by,the Contract Documents, such that Contractor would be entitled to an adjustment of <br /> Contract Sum and possibly an extension of Contract Time. <br /> 25. Field Order: A written order issued by Owner's Representative that requires minor changes in the <br /> Work,but does not involve a change in the Contract Sum or the Contract Time. <br /> 26. Final Acceptance: Formal action by Everett City Council determining that all of the Contractor's <br /> Work has been completed, except for any landscaping maintenance. <br /> 27. Float: The amount of time between the early start date and the late start date, or the early finish date <br /> and the late finish date of any activity in the project schedule. <br /> 28. Force Account: Costs of performing Work as defined in 9.7. Force Account. <br /> 29. Furnish, Install, Perform, Provide, Supply: The word "Furnish" or the word "Install" or the word <br /> "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or <br /> usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, <br /> materials, equipment, and everything necessary to perform the Work indicated, unless specifically <br /> limited in the context used. <br /> 30. General Conditions: This Section 007213 of the Contract Documents. <br /> 31. May: Conduct that is permitted,but not required. <br /> 32. Milestone: A principal event specified in the Contract documents relating to an intermediate <br /> completion date or time prior to Substantial Completion of all the Work. <br /> 33. Notice: A signed, written communication by the Contractor to the Owner as described in ARTICLE <br /> 10. NOTICE TO OWNER. <br /> 34. Notice to Proceed: The written Notice from the Owner or Owner's Representative to the Contractor <br /> authorizing and directing the Contractor to proceed with the Work and establishing the date on which <br /> the Contract Time begins. Multiple and partial Notices to Proceed may be issued on a single Project. <br /> 35. Over-absorbed Overhead: Over recovery of fixed indirect costs that occurs when a Contractor <br /> performs more overall Work than it otherwise would have performed. <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> 007213-6 Issue for Bid ' <br />