c. Failure to schedule Owner furnished or installed materials and Equipment for installation on or <br /> after its planned arrival pursuant to the Owner's contract with the supplier or failure to Notify <br /> ' the Owner of tasks dependent upon the fact or date of arrival of such Owner furnished materials <br /> and Equipment, constitute a waiver by Contractor of any Contract Claim arising out of or related <br /> to the timeliness of the furnishing or installation of such material and Equipment. All schedules <br /> must allow for timely incorporation of any other's work under separate contract with Owner and <br /> ' for timely incorporation of work provided and installed by Owner. Unless otherwise expressly <br /> authorized in writing by the Owner's Representative,the Contractor must integrate the schedules <br /> with the Schedule of Values and unit price items so that each construction activity is represented <br /> by a dollar value. <br /> d. Float in a Progress Schedule belongs to the Owner. <br /> e. Subcontractors shall review all schedules prior to submission to the Owner and Owner's <br /> Representative. At the Owner's option and sole discretion, Owner may require Contractor to <br /> obtain written acceptance of each schedule by Subcontractors as practical and feasible, as the <br /> schedule relates to Subcontractors' work. <br /> f. Contractor shall not schedule any activity with an unrealistic, unduly long, or unduly short <br /> duration. Contractor shall use its best efforts in good faith to set reasonable durations for all <br /> ' activities. Contractor shall not attempt to"grab the Float" or make any effort to use any Float in <br /> the Progress Schedule for the benefit of the Contractor. <br /> g. Contractor shall submit with each Application for Payment or progress pay estimate an updated <br /> ' Progress Schedule, but no less often than monthly. If requested by the Owner's Representative <br /> or the Owner, Contractor shall prepare and submit updated Progress Schedules from time to <br /> time,which may be more frequent than monthly. <br /> ' h. The Contractor hereby expressly agrees and acknowledges that any failure by Contractor to <br /> provide accurate, complete, current and updated schedules with each and every progress pay <br /> estimate or Application for Payment constitutes a waiver of any and all claims or requests for <br /> adjustment of Contract Sum or Time that arise out of, result from, or are caused by, any Delay <br /> ' on the Project or scheduling of the Work. Timely submission of monthly updated schedules is a <br /> condition precedent to any later or subsequent Contract Claim or request for an adjustment of <br /> either Contract Sum or Time related to or arising out of time, an alleged Delay, or the schedule <br /> ' or sequence of Work. Similarly, the parties agree the Owner may withhold progress pay <br /> estimates if updated schedules are not timely submitted. These remedies are cumulative and not <br /> exclusive of any other remedy. The Owner's use of one or more of these remedies does not <br /> constitute an election or prevent the Owner from pursuing other remedies for this or other <br /> defaults. <br /> i. The Owner's Representative's review of any schedule shall not transfer any of the Contractor's <br /> responsibilities to the Owner. The Contractor alone shall remain responsible for adjusting forces, <br /> ' equipment, and work schedules to ensure completion of the Work within the Contract Time. <br /> Review by the Owner or Owner's Representative shall not constitute approval or acceptance of <br /> the Contractor's construction means, methods, sequencing, logic, order, precedence and <br /> succession of activities or Contractor's ability to complete the Work in a timely manner. Any <br /> ' mistakes or errors in any schedule, including, but not limited to, mistakes or errors of logic, <br /> order, precedence, and duration, are and remain the Contractor's. The Owner or Owner's <br /> Representative may comment upon the schedule. <br /> C. Extensions of Contract Time <br /> t <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> ' 00 72 13-21 Issue for Bid <br />