Laserfiche WebLink
I <br /> DIVISION 31 - EARTHWORK <br /> 31 10 00 SITE CLEARING <br /> 31 23 00 EARTHWORK <br /> 31 23 33 TRENCHING, BACKFILLING,AND COMPACTING FOR UTILITIES <br /> 31 25 00 SOIL EROSION AND SEDIMENT CONTROL <br /> 31 62 13 PRECAST PRESTRESSED CONCRETE DRIVEN PILING <br /> 31 62 17 DRIVEN STEEL SHEET PILING <br /> VOLUME 2 1 <br /> DIVISION 32 - EXTERIOR IMPROVEMENTS <br /> 32 91 13 TOPSOILING AND FINISHED GRADING 111 <br /> 32 92 00 SEEDING, SODDING AND LANDSCAPING <br /> DIVISION 33 - UTILITIES I <br /> 33 05 15 PRECAST CONCRETE UTILITY STRUCTURES <br /> 33 05 16 PRECAST CONCRETE MANHOLE STRUCTURES <br /> DIVISION 40 - PROCESS INTERCONNECTIONS <br /> 40 05 00 PIPE AND PIPE FITTINGS: BASIC REQUIREMENTS I <br /> 40 05 06 CORROSION RESISTANT HEAVY DUTY STOP LOGS <br /> 40 05 07 PIPE SUPPORT SYSTEMS <br /> 40 05 17 PIPE: COPPER <br /> 40 05 24 PIPE: STEEL <br /> 40 05 31 PIPE: PLASTIC <br /> 40 05 51 VALVES: BASIC REQUIREMENTS <br /> 40 05 52 MISCELLANEOUS VALVES <br /> 40 05 61 GATE VALVES <br /> 40 05 63 BALL VALVES <br /> 40 05 64 BUTTERFLY VALVES <br /> 40 05 66 CHECK VALVES <br /> 40 42 00 PIPE,DUCT AND EQUIPMENT INSULATION <br /> 40 62 16 COMPUTER NETWORK AND HUMAN MACHINE INTERFACE(HMI) <br /> HARDWARE 111 <br /> 40 63 43 PROGRAMMABLE LOGIC CONTROLLER(PLC)CONTROL SYSTEM <br /> 40 71 00 FLOW INSTRUMENTATION <br /> 40 72 00 LEVEL INSTRUMENTATION <br /> 40 73 00 PRESSURE INSTRUMENTATION <br /> 40 90 00 INSTRUMENTATION FOR PROCESS CONTROL: BASIC REQUIREMENTS <br /> 40 90 05 CONTROL LOOP DESCRIPTIONS <br /> 40 91 10 PRIMARY METERS AND TRANSMITTERS <br /> 40 97 00 CONTROL AUXILIARIES <br /> 40 98 00 CONTROL PANELS AND ENCLOSURES <br /> 40 99 00 SURGE PROTECTION DEVICES(SPD)FOR INSTRUMENTATION <br /> AND CONTROL EQUIPMENT <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> Table of Contents-4 Issue for Bid <br />