My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018 (2)
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
IMCO General Construction Inc 11/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2019 11:19:07 AM
Creation date
4/5/2019 11:05:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
End Date
4/17/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE <br /> EQUIPMENT <br /> 1 43 21 00 PUMPING EQUIPMENT: BASIC REQUIREMENTS <br /> 43 23 16 PUMPING EQUIPMENT: END-SUCTION CENTRIFUGAL PUMPS <br /> 43 23 54 PUMPING EQUIPMENT: PERISTALTIC <br /> 43 25 51 PUMPING EQUIPMENT: MAGNETIC DRIVE CENTRIFUGAL <br /> 43 41 45 FIBERGLASS REINFORCED PLASTIC TANKS <br /> 1 APPENDICES <br /> APPENDIX A GEOTECHNICAL REPORT <br /> APPENDIX B NPDES PERMIT <br /> VOLUME 3- CONTRACT DRAWINGS <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> 1 <br /> I <br /> I <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> Table of Contents-5 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.