Laserfiche WebLink
1 <br /> I <br /> DOCUMENT 00 60 13—CONTRACT <br /> 1.1 GENERAL <br /> A. THIS CONTRACT is made and entered into this 17 day of oc-r06ER , 2018, by and between <br /> the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br /> Washington, hereinafter called the "City," and Two 6f0t.p.M.. G00S k.)CItoo,'IMC , a <br /> IWp%Su t1 i l'oN Coilk Po()Alt ot-.3 ,hereinafter called the"Contractor." <br /> B. In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br /> furnish all labor,tools,materials,equipment,and supplies required to build and construct and to build and <br /> I construct in a workmanlike manner the Work, improvements, and appurtenances in accordance with the <br /> Specifications and Drawings entitled: "WPCF FEN Chlorination Building Upgrade (WO 3614)", (the <br /> "Project"). <br /> I <br /> 1.2 DEFINITIONS <br /> A. Contract Documents. The following documents ("Contract Documents") are incorporated by reference <br /> and are hereby made a part of this Contract: <br /> I 1. Notice to Bidders <br /> 2. Instructions to Bidders <br /> 3. General Conditions <br /> 4. Supplementary Conditions(if any) <br /> I 5. Drawings, Standard Plans, and Specifications <br /> 6. Addenda(if any) <br /> 7. Payment and Performance Bond <br /> I 8. Contractor's Bid Form <br /> 9. Other documents described as Contract Documents in Section 00 72 13, General Conditions <br /> 10. All provisions required by law whether set forth and reproduced herein or not. <br /> II B. Terms that are capitalized in a Contract Document but not defined in that Contract Document shall have <br /> the meaning defined to them in the other Contract Documents. <br /> I C. Contract Time. <br /> 1. See Section 01 11 00 for limitations and construction sequencing restrictions. <br /> 2. Substantial completion for portions of the Work as outlined in 01 11 00-1.6.A shall be completed <br /> on or before September 30,2019. <br /> 3. Substantial Completion of the entire Work shall be achieved on or before December 31, 2019. <br /> 4. Physical Completion shall be within 21 calendar days after the actual date of issuance of <br /> substantial completion. <br /> ID. Liquidated Damages—Work Performed Outside the Seasonal Restrictions. <br /> 1. The parties agree the City will suffer damage and be put to additional expense in the event that the <br /> Contractor does not complete the Work within the seasonal work sequence restrictions outlined in <br /> Section 01 11 00, even if the Work is still being done prior to the required date of Substantial <br /> Completion. <br /> I 2. Because it is difficult to accurately compute the amount of such costs and damages,the Contractor <br /> hereby covenants and agrees to pay to the City liquidated damages for each and every calendar <br /> day (or working day, if Contract Time is described in working days) in the amounts set forth in <br /> this Section. <br /> I10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> CONTRACT <br /> 1 006013-1 Issue for Bid <br />