My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018 (2)
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
IMCO General Construction Inc 11/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2019 11:19:07 AM
Creation date
4/5/2019 11:05:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
End Date
4/17/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 3. For failure to complete work within the allowable time frames noted in Section 01 11 00, the <br /> Contractor shall pay liquidated damages to the City computed at the daily rate of$5,000 per day <br /> multiplied by the number of days that it took the Contractor to complete the portion of the Work <br /> being done outside of the allowable time frame. <br /> F. Liquidated Damages—Substantial and Physical Completion. <br /> 1. The parties agree the City will suffer damage and be put to additional expense in the event that the <br /> Contractor does not complete the Work in all respects and have it ready for use by the Substantial <br /> and Physical Completion dates stated above. <br /> 2. Because it is difficult to accurately compute the amount of such costs and damages,the Contractor <br /> hereby covenants and agrees to pay to the City liquidated damages for each and every calendar <br /> day (or working day, if Contract Time is described in working days) in the amounts set forth in <br /> this Section. <br /> 3. For failure to achieve Substantial Completion by the Substantial Completion date stated above,the <br /> Contractor shall pay liquidated damages to the City computed at the daily rate of$5,000 per day <br /> multiplied by the number of days that it took the Contractor to achieve Substantial Completion <br /> that exceeded Contract Time. <br /> 4. Contractor understands that, if Physical Completion is not achieved by the Physical Completion <br /> Date stated in Paragraph C.3. above, City will suffer damages which are difficult to determine and <br /> accurately specify. Contractor agrees that, if Physical Completion is not so achieved, Contractor <br /> shall pay to City $1,000 per day, as liquidated damages for each day that Physical Completion is <br /> delayed. <br /> F. Contract Sum. <br /> 1. The amount of this Contract is 1 -7 3347113:36 <br /> ($ ) and is based on the proposal/bid submitted by Contractor dated <br /> a-11-poik <br /> 2. The basis for final payment will be the actual amount of work performed according to the Contract <br /> Documents and payments,whether partial or final, shall be made as specified therein. <br /> a. If, and to the extent, payment (in whole or in part) is based upon unit prices multiplied by <br /> quantities of work actually performed, the total amount paid to the Contractor may be less <br /> than Contract Sum stated herein and the Contractor agrees to execute one or more change <br /> orders in such event. <br /> b. In no event shall the total amount paid Contractor exceed the Contract Sum stated herein, <br /> unless the Contract amount has first been increased by one or more Change Orders signed <br /> by the City. <br /> c. The City may, in its sole discretion, withhold amounts from payments otherwise due as <br /> offsets or backcharges for expenses, damages, liquidated damages or costs for which the <br /> Contractor is liable for not to exceed 10%of the total amount of the contract. <br /> d. If the City chooses not to offset or deduct any such expenses, damages, liquidated damages <br /> or costs from one or more payments or return of retainage, the City does not waive its <br /> claim for such damages and hereby expressly reserves its right to assert a claim against the <br /> Contractor for such damages. <br /> G. Withholding. <br /> 1. Five percent of amounts due Contractor shall be retained and withheld to ensure to comply with 1 <br /> RCW Chap. 60.28. <br /> 2. Retained amounts shall only be released: <br /> a. as required by law or <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> CONTRACT <br /> 00 60 13-2 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.