Laserfiche WebLink
• <br /> 9 <br /> Exhibit G(REVISION 1)-Information Technology System <br /> PURPOSE: Deployment of security upgrades and enhancements around the Everett Station as provided by <br /> Sound Transit and the City of Everett for the safety of the patrons, staff,and general operation of the facility. <br /> Sound Transit will install and configure cameras and Customer Emergency Stations(CES)around the Everett <br /> Station facilities on areas owned by Sound Transit and the City of Everett. Sound Transit will also provide the <br /> City of Everett 1 work station, monitor,and key board and necessary software licensing to view the video <br /> provided by the cameras. <br /> Everett cost <br /> Product qty Individual Cost Total &11 Cameras Notes <br /> a <br /> • Infrastructure) <br /> Cameras(includes mount) 50 $850 $42,500 $9,350 Includes 1 spare,11 for City of.Everett <br /> Camera Licensing 50 $250 $12,500 $2,750 <br /> CES(phone/pole/light) 17 $6,000 $102,000 $0 Additional CES discovered and added, <br /> totaling 17 now <br /> Network Security Manager 1 $10,000 $10,000 $2,200 <br /> (NSM)(Video Storage) <br /> Outdoor Enclosures(Nema 4 $4,000 $16,000 $4,000 <br /> 3R) <br /> Ethernet Switches 0 $1,750 $0 $0 <br /> (New/Indoor Rated)8 Port <br /> Ethernet Switches 6 $1,800 $10,800 $ 1,800 <br /> (New/Indoor Rated)12 Port <br /> Ethernet Switch(Indoor 1 $4,000 $4,000 $880 <br /> rated)24 Port <br /> Conduit work(ST Staff) 1 $25,000 $25,000 $1,000 Still need cabling estimate for <br /> trenchless boring <br /> .Fiber installation(Low volt) 1 $10,000 $10,000 $1,387 _ <br /> UPS(Universal Power) 4 $200 $800 $200 <br /> Tripp Lite <br /> UPS APC-For NSM 1 $2,000 $2,000 $0 <br /> Cabling(Electrical&Low 1 $5,000 $5,000 $1,100 <br /> Volt) <br /> Elevator Camera <br /> Installation(2-North& 2 $9,000 $18,000 $0 Current contract may expire in March, <br /> South) vendor at risk <br /> Equipment Rental(For CES 1 $1,000 $1,000 $0 <br /> Installation/Removal) <br /> Disposal Fees-To be 1 $1,000 $1,000 $220 <br /> recycled <br /> Computer Equipment To 1 $1,200 $1,200 $1,200 <br /> Everett Security Office <br /> Total $261,800.00 $26,087 <br /> Contingency 15% $39,270.00 $ 3,913 <br /> $301,070.00 $30,000* <br /> With tax 11% $334,187.70 <br /> TIP-700685(Originally 40 <br /> Cameras and 14 CES. $289,000.00 <br /> Authorized in 2017) <br /> Budget Amendment $45,187.70 <br /> *The City of Everett will pay the amount of$30,000.00 to Sound Transit for the Security Network Upgrade.. <br /> Everett Station Operations&Maintenance Agreement, December 2015 <br /> Pagel of 1 GA 0511-16 <br /> 52 <br />