Laserfiche WebLink
BID SUMMARY <br /> Alverson Stornawater Separation Project <br /> W.O.# 3660 <br /> Date 3/25/2019 <br /> For: Arnie Roshak,Project Engineer <br /> Bidder Name: Bidder Totals: <br /> ENGINEER'S ESTIMA'1'E $2,073,636.00 <br /> Strider Construction Co.,Inc. $1,179,800.00 (Withdrawn due to bid error) <br /> Rodarte Construction,Inc. $1,460,182.00 <br /> Thomco Construction $1,488,202.15 <br /> Redtail,LLC $1,528,301.17 <br /> Marshbank Const. Inc. $1,623,337.00 <br /> D+G Backhoe Inc. $1,757,406.93 <br /> B &L Utility,Inc. $1,763,172.00 <br /> Laser Underground&Earthworks,Inc. $1,784,306.00 <br /> Kar-Vel Construction $1,843,192.00 <br /> Faber Construction Corporation $1,882,515.00 <br /> R.L.Alia Company $1,925,951.00 <br /> Road Construction NW,Inc. $1,950,853.25 <br /> Interwest Construction,Inc. $1,993,413.12 <br /> 153 <br />