My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/04/10 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/04/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 9:20:43 AM
Creation date
4/16/2019 9:19:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; ` /1 <br /> Strider Construction Co„Inc. <br /> I9ALVI3RSON Alverson S(onmtater Seperation I'J I <br /> July Curtis 03/20/2019 11:56 <br /> Direct Cost Repnrt <br /> Activity Dose Quantity Unit Penn Consir Equip Sub <br /> Resource Pcs Unit Cost Labor Material R4atifExp Mont Contract 'fetal <br /> BID ITEM = 10 CLIE:NTII= I <br /> Description= Mobilirnlion Unit= LS Takeoff Quan: 1.000 Engr Quan: 1.000 <br /> 10.2 Supervision Quan: fl9iflrs/Shft; 9.00 Cal: 45 WC:WA0I01 <br /> I.,- tarp `�`• <br /> Figured 3 months Super with full time Asst PM <br /> $TRI/2 '"---=> I/2 TN Pickup 1.00 ,3$2:tU HR 5 28 6.750 2,376 <br /> STR3/4 =>3/4 TN 4x4 Pickup 1.00 .40B.lb HR 41.-4049 8.625 3;150 3,450 <br /> 3,450 <br /> APM =>Assistant Project Mann 1.00 _,352:00 MH r 35.000 16,090 <br /> 16,090 <br /> PMI =>Project Manager 1.00 J.58130 MH ',..??Of-255.000 2 10.730 10,730 <br /> SI =>Superintendent 1.00 408:00 MII (' 61.720 33,751 <br /> $66,396.89 902.0000 MH/LS 902.00 MI-I 33,751 <br /> 46630.65) 60,571 5,826 66,397 <br /> 10.3 Facilities Quan: 3.00 MTH Hrs/Soft: 10.00 Cal: 40 'WC:WADI 01 <br /> 2COMM Communicationsg109,7% 1.00 MTH 150.000 494 <br /> 2ELEC Elcctricityi/109.7% 1.00 3 MTI-I4942 <br /> � 100.000 329 • 329 <br /> 2SANIKAN Sal)ikan r;109.7% 1.00 6,10_11114 125.000 823 <br /> 30FFICE Office For Strider&'•City 1.00 3 On n.IO 850 <br /> $3,895.50 750.000 2,250 2,250 <br /> [ 1 1,646 2,250 3,896 <br /> > Item Totals: lt) - Mobilization <br /> $70,292.39 902.0000 MH/LS 902.00 MH I [40630.05) 60,571 1,646 2,250 5,526 <br /> 7(1,292.390 ILS 70,292 • <br /> 60.570.89 1,645,50 2,250.00 5,826.00 70.292.39 <br /> $70,292.39 kea Report Totals ::= 902.00 8414 ..._--------- � . <br /> 60,571 1,616 2,250 5,826 70,292 <br /> >>>indicates Nun Additive Activity <br /> ----Report Notes:---- <br /> The estimate was prepared with TAKEOFF Quantities. <br /> This report shows TAKEOFF Quantities with the resources. <br /> Bid Date:03/19/19 Owner: Engineering Firm: <br /> Estimator-In-Charge:JDC' <br /> JOB NOTES <br /> Estimate'created on: 03/31/2016 by Userti_ 5 Nathan Cutler - <br /> Source estimate tsed: R:\HEAVYBID\F'ST\SCt'T <br /> • <br /> *AA`.k*******Estimate created on: 09/14/2016 by Userti: 2 - Jerry Curtis <br /> Source estimate used: R:\HEAVYBID\EST\1GFRIDAYIVATR <br /> **'-***""'"Estimate created on: 12/19/2017 by Userti: 2 - Jerry Curtis <br /> Source estimate used: R:\HEAVYBTD\EST\16COBWATER <br /> ************Estimate created on: 10/08/2018 by Userll: 2 - Jerry Curtis <br /> • <br /> Source estimate used: R;\HEAVYBID\EST\17CDBWATER <br /> k***********Estimate created on: 03/12/2019 by Userti: 2 - Jerry Curtis <br /> Source estimate used: R:\ItEAVYBIo\EST\18BESTtATER <br /> on units of MI'l indicate average labor unit cost was used rather than base ante. <br /> • <br /> [ .)in the Unit Cost Column=Labor Unit Cost Without Labor Burdens <br /> In equipment resources, rent % and EOE $ not = 100% are represented as XXX%YYY where XXX=Rent; and YYY=EOE% • <br /> Calendar Codes <br /> 40 40!lour NO 01 <br /> 156 <br />
The URL can be used to link to this page
Your browser does not support the video tag.