Laserfiche WebLink
c i <br /> r . <br /> Strider Construction Co.,Inc. Page 1 <br /> I9ALVERSON Alverson Stormwater Separation 03/20/2019 14:09 <br /> Jerry Curtis Direct Cost Report <br /> Activity Desc Quantity Unit Perm Conslr Equip Sub- <br /> Resource Pcs Unit Cost Labor Material Matt/Exp Meat Contract Total <br /> BID ITEM = 100 CLIENT#= 10 <br /> Description= CSBC Unit= TN Takeoff Quan: 3,781.000 Engr Quan: 3,781.000 <br /> • <br /> 100.2 » •'lacement of Paving CSTC Quan: 700.00 TN Hrs/Stift: 9.00 Cal: 45 WC:WA0101 <br /> Plac= ent in patch area <br /> G s5.2 LeeBoy Grader Crew 17.50 CI-! Prod: 40.0000 UH Lab Pcs: 3.50 Eqp Pcs 3.50 <br /> 8 48 48'Vib DD Roller 1.00 17.50 1-IR 33.750 591 591 <br /> RLB Lee Boy Grader 1.00 17.50 HR 26.350 461 461 <br /> :TK3500VIT 3,500 Gallon W/T 0.50 8.75 HR 45.750 400 400 <br /> 8TRSURV Grade Checker PU 1.00 17.50 HR 15.500 271 271 <br /> 01 Finish Blade Oper. 1.00 17.50 MI-I 65.480 1,564 1,564 <br /> 03 Roller Operator 1.00 17.50 MH 60.980 1,459 1,459 <br /> 04 Grade Checker,Dirt 1.00 17.50 MH 54.320 1,304 1,304 <br /> T3 W/T Driver 0.50 8.75 MH 53.460 642 642 <br /> $6,692.51 0.0875 MH/TN 61.25 MH [5.476] 4,969 1,723 6,693 <br /> 100.3 'acment for Bedding Quan: 3,000.00 TN Hrs/Stift: 10.00 Cal: 40 WC:WA0101 <br /> ZZZ CUSTOM CREWS 85.71 CH Prod: 35.0000 UH Lab Pcs: 3.00 Eqp Pcs: 2.00 <br /> SEX .51-1P Hitachi 135 Exc.vv/HP 1.00 85.71 HR 45.688 3,916 3,916 <br /> 8L T28 Cat IT28 Loader 1.00 85.71 HR 39.813 3,412 3,412 <br /> Pipelayer 1.00 85.71 MH 47.440 5,312 5,312 <br /> 12 Heavy L•QP Oper. 2.00 171.43 MH 64.260 14,271 • 14,271 <br /> $26,911.20 0.0857 MEI/IN 257.14 MI-I [5.027] 19,583 7.328 26,911 c <br /> 100.5 Rock Quan: 3,781.00 TN Hrs/Shft: 9.00 Cal: 45 WC:WA0101 Of <br /> This is for Delivered material to jobsite stockpile. <br /> 2AGCSBC Delivered@109.7% 1.00 3,781.00 TN 21.550 89,384 89,384 • <br /> 1 <br /> > Item Totals: 100 - CSBC 9rta91.443$r1 <br /> E. 23.640 16 3781 TN [ ] 823.64 9,3849,384 i <br /> 4r 1221888` 823.64/ <br /> 3253rs. • <br /> • <br /> $89,384.16 *** Report Totals *** 89,384 89,384 <br /> »>indicates Non Additive Activity <br /> - . -- _ - - - - --- - -.. __. . . _. _ <br /> The estimate was prepared with TAKEOFF Quantities. • <br /> This report shows TAKEOFF Quantities with the resources. <br /> Bid Date:03/19/19 Owner Engineering Finn: <br /> Estimator-In-Charge:.TDC <br /> JOB NOTES <br /> Estimate created on: 03/31/2016 by User#: 5 - Nathan Cutler <br /> Source estimate used: R:\HEAVYBID\EST\SCCI <br /> ************Estimate created on: 09/14/2016 by User4: 2 - Jerry Curtis <br /> Source estimate used: R:\HEAVYBID\EST\16FRIDAYWATR <br /> ************Estimate created on: 12/19/2017 by User#: 2 - Jerry Curtis <br /> Source estimate used: R:\HEAVYBID\EST\16COBWATER <br /> ************Estimate created on: 10/08/2018 by User41: 2 - Jerry Curtis • <br /> 157 . <br />