My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/04/10 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/04/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 9:20:43 AM
Creation date
4/16/2019 9:19:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: gn <br /> An Ordinance Creating a Briefing COUNCIL BILL# Q kD ' l"1 <br /> Special Tmprovement Project Proposed Action Originating Department Public Works <br /> Entitled"Alverson Stormwater Consent Contact Person Arnie Roshak <br /> Separation Project"Fund 336, X Action Phone Number (425)257-7249 <br /> Program 001,to Accumulate First Reading FOR AGENDA OF April 10, 2019 <br /> all Costs for the Tmprovement Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> Administration <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Northwest Neighborhood Call for Bids 2/13/19 Proposed Ordinance Public Works, Legal <br /> along Alverson and <br /> Grand Avenue <br /> Amount Budgeted $ 1,750,000 <br /> Expenditure Required $ 1,750,000 Account Number(s): UP 3660 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Alverson Stormwater Separation Project is Phase 3 of the Northwest Stormwater Separation Project, <br /> which will install a new separated storm drain system in the right-of-way. The project is needed to address <br /> surface and basement flooding and capacity issues within the existing combined sewer system. The new <br /> storm drain network will convey stormwater flow to detention ponds on the Legion Memorial Golf Course <br /> (completed Phase 1 Project):The Alversori projectwilll expand-the area to be separated:Tliportion <br /> was installed under Phase 2,the North Wetmore Stormwater Separation project,which is nearing <br /> completion. <br /> The budget for the project is$1,750,000 which includes the construction contract of$1.46 million and a 20% <br /> construction contingency from Fund 401, Water and Sewer Utility Fund. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Adopt an Ordinance creating a special improvement project entitled"Alverson Stormwater Separation <br /> Project"Fund 336,Program 001,to accumulate all costs for the improvement. <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.