Laserfiche WebLink
ILEmEX <br /> 5/30/2014 <br /> To: Dan Reynolds-Wyser Construction <br /> Re: Everett Clinic/ Hanson Property UST Removal, <br /> Dan„ <br /> Based on the soil data provided to CEMEX by Wyser Construction for the <br /> contaminated soil located at and being removed from 3827 Rucker <br /> Ave.Everett,WA, the soil is acceptable for thermal treatment and disposal at our <br /> soil remediation facility located at 6300 Glenwood Ave, Everett WA. <br /> If you have any questions or require additional information please don't hesitate <br /> to contact me. <br /> Thank You, <br /> • <br /> Larry W. Baker <br /> Operations Manager-Soil Remediation <br /> Northwest Region <br /> U.S. Operations <br /> Office 425-356-6619 <br /> Cell 425-210-8429 <br /> Fax 425-356-6614 <br /> Email: larryw.baker@cemex.com <br /> www.cemexusa.com <br />