My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3927 RUCKER AVE 2ND FLOOR 2019-04-17
>
Address Records
>
RUCKER AVE
>
3927
>
2ND FLOOR
>
3927 RUCKER AVE 2ND FLOOR 2019-04-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2019 7:27:00 AM
Creation date
4/17/2019 7:26:58 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3927
Tenant Name
2ND FLOOR
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lighting Summary LTG-SUM <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2,R3,R4 over 3 stories and all R1 Revised Nov 2017 <br /> Project Info Project Title: The Everett Clinic-Hand Therapy Remodel Date 8/30/2018 <br /> Compliance Applicant Information. Provide contact information for individual who can For Building Department Use <br /> forms do not respond to inquiries about compliance form information provided. <br /> require a Company Name: The Everett Clinic <br /> password to <br /> use. Company Address: 3901 Hoyt Ave. <br /> Instructional and <br /> calculating cells Applicant Name: Janet Monda <br /> are write- <br /> protected. Applicant Phone: 425-823-2244 <br /> Applicant Email: janet@awerks.com <br /> Project Description ❑New Building ❑Addition Q Alteration ❑No Lighting Scope <br /> Include PROJ-SUM form(included in envelope forms workbook)with lighting compliance forms. <br /> Interior Lighting System Removal and relocation of several fixtures, plus additional fixtures added to treatment space. <br /> Description <br /> Q Interior Lighting Plans Included <br /> Interior Lighting Power ❑ Building Area Method ❑✓ Space-by-space Method <br /> Allowance Method Select method used in project. <br /> Interior Lighting Controls Q All C405.2.1-C405.2.8 Lighting Controls ❑C405.2 Exception 5 Luminaire Level <br /> Lighting Controls(LLLC) <br /> ❑Additional Efficiency Package Option <br /> C406.4 Enhanced Digital Lighting Controls <br /> To comply with C406.4,no less than 90%of the total installed interior lighting power shall comply with the <br /> required controls per C406.4. <br /> Dwelling Unit Interior Permanently installed interior lighting fixtures in dwelling units comply with: Q No Dwelling <br /> Lighting 0 C405.2 thru C405.5 Commercial Lighting Controls and LPA Units <br /> Q C406.3 High Efficacy Lighting <br /> Q R404.1 Residential High Efficacy Lighting. Dwelling unit lighting complies with WSEC Residential <br /> provisions in lieu of WSEC Commercial provisions. <br /> Exterior Lighting System No work. <br /> Description <br /> ❑ Exterior Lighting Plans Included <br /> Building Additions Compliance Method Interior lighting Exterior lighting <br /> Lighting systems in addition area comply with all applicable ❑ ❑ <br /> provisions as a stand alone new construction project <br /> Refer to Section C502.2.6 for additional <br /> requirements. Lighting systems in addition are combined with existing ❑ ❑ <br /> building lighting systems to demonstrate compliance <br /> Addition is combined with existing: <br /> For interior lighting projects,include new+existing-to-remain interior lighting fixture wattage in <br /> Proposed Lighting Wattage table in LTG-INT-BLD or LTG-INT-SPACE form. <br /> For exterior lighting projects,include new+existing-to-remain exterior lighting fixture wattage in <br /> Proposed Tradable and Proposed Non-Tradable Lighting Wattage tables in LTG-EXT form. <br /> I 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.