Laserfiche WebLink
r <br /> • <br /> PUBLIC WORKS <br /> May 26, 2016 <br /> Brian Knopf <br /> pickensmountainfarm@gmail.com <br /> RE: Owner: Swallwell's First LLC <br /> Job Address: 2916 State St ste. 102 <br /> Plan Check No: B1604-020 <br /> Dear Mr. Knopf, <br /> In response to your application for a construction permit, your plans have been examined and you are <br /> advised that revisions may be necessary before a permit can be issued. Please review and respond to the <br /> comments below. These comments address building issues only. Additional revisions or additions may be <br /> required by other departments (such as Utilities, Planning or Fire). All references refer to the 2012 <br /> International Building Code (IBC), the 2012 International Fire Code (IFC), the 2012 International <br /> Mechanical Code(IMC), and the 2012 International Energy Conservation (IECC), as amended by the <br /> State of Washington and adopted by the city of Everett.The current IBC referenced standard for <br /> accessible design is the 2009"Accessible and Usable Buildings and Facilities"(ICC/ANSI A117.1). Federal <br /> ADA, FHA, and HUD regulations and standards, including the Fair Housing Accessibility Guidelines may be <br /> more restrictive. <br /> In order for the processing of your application to continue, it will be necessary to provide the <br /> Building Division with two complete new sets of construction documents reflecting the <br /> corrections requested. <br /> 1. Regarding item 1 of the previous letter; the butane to be stored outside of the <br /> building must be stored in an"outdoor control area". The outdoor control area <br /> must comply with Section 5003.12 of the fire code (enclosed). Please provide <br /> specific details and location for the outside control area. <br /> If you have any questions, please call me at 425-257-7264. <br /> Upon submittal of the drawings, your application will be given priority and plan reviews will recommence. <br /> All required submittals shall be sufficient detail and contain sufficient information to ensure that the <br /> proposed structure will be constructed in compliance with all adopted codes.Sincerely, <br /> Steve Miller <br /> Associate Engineer <br /> ENGINEERING/PUBLIC SERVICES DIVISION • 3200 Cedar Street•Everett,WA 98201 •(425)257-8800•Fax(425)257-8856 <br />