|
•
<br /> FIELD REPORT D,#,-.,...:,'.A:
<br /> ':,.-1.-.--.:-.,
<br /> .-=.•':.,,"-.
<br /> ,',,,,,,•
<br /> ,,'''..,.,-
<br /> .',,,'•i''.-,,YF,
<br /> `:l,,,',•".4.:„,'1',,.,"
<br /> ,.',•
<br /> ,:t',.•,-,,.,,..J,',R 0050
<br /> G,tI,:„:•-b,;_,,,'.,',',-z':',.:.-I,:t',-;l,:,,,-:t
<br /> EO PHOTO LOG Date: 6/1 6 3Zof 4
<br /> a
<br /> g
<br /> SIJ.,. •' .et -,3` :r1• , xa c
<br /> t , � 3
<br /> rx 2P7,
<br /> 3
<br /> ' * 'tai .a, ;e> ,T \ ' t e k
<br /> 7
<br /> Stix
<br /> Comments: Lot 267-Backfilling of western over Comments: Lot 259-Soft brown sandy SILT with organics
<br /> excavated area with railroad ballast material (unsuitable material)encountered for Lot 268
<br /> t.
<br /> ,,
<br /> .��. `s ,4 rte+
<br /> ° ' arm ,- '�
<br /> w
<br /> fir •' re 1
<br /> y
<br /> '4:+a,,,,,,,,,,,,,,;::.:4,,,,,,,,it,..",k,,:::::,,,,,,,z,K,
<br /> Comments: Lot 267-Over excavation of unsuitable Comments: Lot 268- •Depth to hard ground for lot area
<br /> material for eastern portion of lot area(up to 3 feet). east of the berm material encountered (-3 feet).
<br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the
<br /> contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does
<br /> not include supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible for site safety. This field report is a
<br /> DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the
<br /> GeoDesign project manager,as indicated by initials in the"Reviewed By”section. —
<br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 .0'/!
<br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 /�
<br />
|