Laserfiche WebLink
FIELD REPORT DFR 050 <br /> G <br /> _ Date: 6/16:42R2.1. <br /> /2017 <br /> DPHOTO LOG � ,�- <br /> d .:•::':,r,,,,,,,,,,,,-k.,=---,3::,,,,,,,,,,,,A,,',, <br /> f �^ '' ^M <br /> .,,;,,..:T‘.:,';'::':' � a ze���: - ����'*`: to k' � <br /> a <br /> .e Y <br /> • <br /> e. <br /> Comments: Lot 270-Test pit exposing unsuitable Comments: Lot 2,-4';0#40; <br /> 68-Exposed sidewall showing 5 feet <br /> material associated with old berm at approximately 3 feet thick layer of unsuitable material beneath foundation area <br /> BGS. <br /> b <br /> # to t` <br /> '' - ',',,,4-,4 Al,,,,'"'":'',4.,:i44.2',.n.A!,,,,„...04'.:',,,iv.:A,,, 4 <br /> u <br /> " 9 ,. a%i b" '4' ',#,,xt-'%.'"`t.,':' <br /> .,'i': <br /> to � k � ' � ,o..� <br /> Comments: Lot 267-Over-excavated eastern portion of Comments: Lot 268-Close up of unsuitable fill material <br /> lot area. encountered for Lots 267, 268, 270,and assumed from <br /> Lots 267-274. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental seryices. We rely on the <br /> contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does <br /> not include supervision or direction of the contractor,the contractor's employees or agents. Our firm Is not responsible for site safety. This field report is a <br /> DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the <br /> GeoDesign project manager,as indicated by initials in the"Reviewed By"section. __ <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.8 /6, 1) <br /> 38.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />