My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2021-94
>
Ordinances
>
Ordinance 2021-94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2019 11:57:15 AM
Creation date
4/19/2019 11:55:37 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2021-94
Date
8/3/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT COMPREHENSIVE PLAN <br /> LAND USE ELEMENT <br /> bfor the Everett Planning Area. Many of the <br /> housing goals of the Housing Element will be While the private sector will finance and build <br /> I implemented through changes to the City's most of the development envisioned by the <br /> land use policies, maps and regulations. The comprehensive plan, much of the <br /> Land Use Element must describe the changes infrastructure and all of the public services <br /> I necessary to meet the goals of the Housing within Everett must be provided by local <br /> Element. government. Infrastructure improvements will <br /> likely be funded by a combination of private <br /> 3. Capital Facilities (including Parks): sector, local government, and state and federal <br /> Capital facilities include those public lands and funding. The Capital Facilities Element <br /> buildings needed to provide public services. identifies desired levels of public services, the <br /> IWhile the City will have a separate Parks and costs of providing services to the desired <br /> Recreation Plan, the GMA requires that park levels, and the amount of land and building <br /> I lands and recreation buildings be included in space required to provide public services. <br /> the inventory of capital facilities. The Capital This category includes such services and <br /> Facilities Element is essentially a financial plan facilities as schools, fire stations, water supply <br /> I describing how local governments will pay for and sewage treatment facilities, libraries, <br /> public facilities at the levels of service desired parks, and other general purpose government <br /> by the community. Since previous planning buildings. <br /> I efforts by the City and Snohomish County <br /> were targeting lower populations than The Capital Facilities Element must provide a <br /> required under the GMA, the planned levels of realistic plan for financing costs of land <br /> 1. public services and the land areas needed to acquisition and construction of the all capital <br /> provide for such services were not facilities needed to provide public services for <br /> programmed into previous land use plans for all of the activities encouraged by the Land <br /> I the Everett Planning Area. This means that Use Element. The Land Use Element, in turn, <br /> the large increase in the projected population must designate sufficient land areas for the <br /> will require greater levels of investment in various types of public service uses identified <br /> I public services, more land area, and more by the Capital Facilities Element. The level of <br /> buildings in which to locate the public services land use activity supported by the Land Use <br /> than were provided for by the previous plans. Element is dependent upon the ability of the <br /> ICity to pay for the public services and facilities <br /> While more land is needed for public services, required to serve such activities. The levels of <br /> I the higher population and employment public services and facilities is partially <br /> projections for the GMA mandated plans will dependent upon the capacity of the Land Use <br /> increase the demand for other land uses. The Element to provide sufficient land area for <br /> I private sector will compete directly with local public services. <br /> governments for acquisition of urban lands. A <br /> limited supply of urban land and increased 4. Urban Design and Historic Preser- <br /> I competition for urban land uses may drive up vation: This element is not mandated by the <br /> the cost of land for public purposes. The GMA, but is one which Everett has elected to <br /> amount of land required for public services include in its comprehensive plan for two <br /> 16 within the Everett Planning Area must be important reasons. First is that Everett has a <br /> determined by the Capital Facilities Element, rich legacy of historic traditions and properties <br /> and provided for by the land use designations which the Everett Vision 2000 citizen's <br /> I <br /> of the Land Use Element. committee has recommended be preserved and <br /> I <br /> LU-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.