Laserfiche WebLink
GEHIDESIGN FIELD RE 2 Of <br /> Project Name: Everett River Front-Simpson Report: 047 <br /> GeoDesign#: Polygon-127-03 Date: 06/9/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> . rte ..:- .' '. ..r.�-�„,".�,•.,: �;:° s ,,.a. _, �r�". <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Cloudy, 60's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1500/1630 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg <br /> Attachments: m Site Plan(s) m Density Test Summary Signature: 4y:-.-. <br /> 0 Installation Records m Other Reviewed By: <br /> SUMMARY of OBSERVATIONS (CONTINUED): <br /> LOT 266: <br /> Today, GeoDesign noted that Craig with DDS had completed excavation of the foundation and crawl space area for Lot 266 <br /> to approximately 2 feet below plan bottom of footing. GeoDesign noted that the exposed foundation subgrade material <br /> consisted of a brown to gray brown silty SAND with gravel which could generally be probed 3 inches using a 1/2 inch <br /> diameter soil probe and up to 8 inches in pockets near the center of the lot. GeoDesign recommended the placement of <br /> geotextile fabric over the lot area prior to backfilling with a 2 inch clean crushed railroad ballast material. <br /> A summary of our observations can be found in the attached Figure 1, Figure 2, and Nuclear Density Gauge Data. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project Irrespective of the presence of our representative. Our work does not Include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />