My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 RAILWAY AVE 2019-04-29
>
Address Records
>
RAILWAY AVE
>
2410
>
2410 RAILWAY AVE 2019-04-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 1:08:35 PM
Creation date
4/29/2019 1:08:32 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41- <br /> MIGIZI GROUP, INC. <br /> M i*7 I Z( r` �)( PO Box 44840 PHONE (253)537-9400 <br /> Tacoma,Washington 98448 FAX (253)537-9401 <br /> November 7,2018 E <br /> Interwest Construction Co. <br /> 609 Hill Boulevard <br /> Burlington,Washington 98233 <br /> Attention: Roy Swihart <br /> Subject: Proposal for Geotechnical Services <br /> Railway Avenue Improvements <br /> Riverpoint <br /> Everett,Washington 98201 <br /> P/N 00480100200800 <br /> MGI Proposal T908-18 <br /> Dear Mr.Swihart: <br /> Migizi Group, Inc. (MGI) is pleased to submit this proposal to conduct a geotechnical <br /> engineering evaluation for the proposed extension of Railway Avenue in Everett, Washington. <br /> This proposal is based on email conversations and civil plans dated 08/23/2018 provided by Sitts <br /> &Hill Engineers,Inc. <br /> SITE AND PROJECT DESCRIPTION <br /> We understand that Railway Avenue will be extended north a distance of approximately <br /> 2,000 feet from the existing terminus. A 12-inch water line and a 54-inch storm line will also be <br /> constructed as part the improvements. <br /> The project site is currently vacant. Surface topography is relatively flat. <br /> SCOPE OF SERVICES <br /> In order to provide geotechnical recommendations for the project, we will need to determine <br /> subsurface soil and groundwater conditions at depth. Accordingly, we will hire Holt Services <br /> Inc. to drill 6 borings to nominal depths of 10 feet along the proposed alignment on <br /> approximately 400 foot centers for a total drilling footage of 60 feet. <br /> Auger borings will be conducted under contract to MGI. MGI will provide geotechnical <br /> personnel and laboratory services for this project based out of our office in Tacoma, <br /> Washington. <br /> age { uN j <br />
The URL can be used to link to this page
Your browser does not support the video tag.