My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 RAILWAY AVE 2019-04-29
>
Address Records
>
RAILWAY AVE
>
2410
>
2410 RAILWAY AVE 2019-04-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 1:08:35 PM
Creation date
4/29/2019 1:08:32 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interwest Construction Co.—Railway Avenue Improvements,Riverpoint,Everett,WA November 7,2018 <br /> Proposal for Geotechnical Services T908-18 <br /> We anticipate that our services will include field explorations, geologic and geotechnical <br /> research,and the preparation of a geotechnical design report. <br /> Field Coordination: We will call utility locating prior to drilling. If needed,we can also request a <br /> private locating company to verify that the planned borehole locations are free of underground <br /> utilities prior to drilling, at additional cost. Upon arrival at the site, we assume that the <br /> equipment and crew will be given ready access to the work locations and that any necessary <br /> permits or rights-of-entry will have been obtained in advance by the client. During our field <br /> explorations,we will limit disruption of ongoing activities at the site. <br /> Site Restoration: We will exercise due care while working at the site, but it should be realized <br /> that some surface disturbance is unavoidable. Such disturbance could include track rutting,soil <br /> mounds,bare spots, slight subsidence, and/or soft areas. Although we perform general clean- <br /> up and restoration tasks before leaving the site, complete restoration of these disturbed areas <br /> and/or repaving is not included in our scope of services. Spoils from our borings will be left on <br /> site in the vicinity of each drilling location. If needed,we can request the drilling contractor to <br /> drum and/or remove spoils from the site at additional cost. <br /> GEOTECHNICAL REPORT PREPARATION <br /> After analyzing the site conditions, we will prepare a Geotechnical Design Report for the project. <br /> Our report will include the following specific items: <br /> • Site plan showing approximate exploration locations on a base map supplied to us; <br /> • Descriptive logs of our subsurface explorations; <br /> • Description of surface,soil,groundwater,and seismic conditions; <br /> • Conclusions regarding excavation, support, and installation of the planned water <br /> and storm sewer lines including design recommendations for shallow or mat <br /> foundations,as appropriate; <br /> • Recommendations for actions in areas of unsuitable soils,if any; <br /> • Conclusions regarding the reuse of onsite soils and import soils for structural fill; <br /> • Conclusions regarding onsite liquefaction potential; <br /> • Recommended seismic design parameters,including I.B.C.soil profile type; <br /> • Recommendations for site preparation, including stripping depth, compaction, and <br /> structural fill placement; <br /> • Design pavement sections in accordance with City of Everett requirements; <br /> • Recommendations for construction monitoring; <br /> • Explanation of report limitations;and <br /> • Recommendations for further geotechnical study,if warranted. <br /> AMigizi Group,Inc. 1"age-?ref•4 � y <br />
The URL can be used to link to this page
Your browser does not support the video tag.