My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 RAILWAY AVE 2019-04-29
>
Address Records
>
RAILWAY AVE
>
2410
>
2410 RAILWAY AVE 2019-04-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 1:08:35 PM
Creation date
4/29/2019 1:08:32 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interwest Construction Co.—Railway Avenue Improvements,Riverpoint,Everett,WA November 7,2018 <br /> Proposal for Geotechnical Services T908-18 <br /> TIME AND COST ESTIMATE <br /> Based on our current schedule,we anticipate that the borings can be drilled around 2 weeks after <br /> receipt of your authorization to proceed,depending upon availability of the drill rig. Our written <br /> report will be available about three to four weeks after completion of our field work, or sooner if <br /> required by your design schedule. We can provide preliminary design data to you or the design <br /> team members prior to issuance of our final report as it becomes available. <br /> Our services will be performed on a Time and Materials (T&M)basis for an estimated total fee <br /> of $6,950 under the conditions outlined in the attached Professional Services Terms and <br /> Conditions and Schedule of Charges. Our services are based on the following cost estimates: <br /> ITEM raOPE O� �R�ZCES ,,.. . COS' 0TIM1,Tt <br /> 1 Drilling Contractor(140 feet of drilling) $3,600 <br /> 2 Field Engineering,Travel Time,Mileage(MGI Geologist) $ 850 <br /> 3 Lab Testing $ 300 <br /> 4 Geotechnical Report with Engineering Analyses and Review $2,200 <br /> TOTAL COST ESTIMATE $6,950 <br /> fi <br /> If adverse conditions arise during our evaluation, we will inform you as soon as possible and <br /> will perform no work beyond the authorized scope without your approval. Post-letter services <br /> such as plan reviews, response to review comments, meetings, supplemental analyses, or <br /> construction monitoring would be billed on T&M basis and are not induded in the original <br /> estimate. <br /> We recommend that this estimate be used as a budget figure. Our total charges will depend, of <br /> course,on the actual amount of field and office labor necessary. We will advise you if our total <br /> charges reach 90 percent of the fee estimate before completion of our engineering activities. At <br /> that time, we will review job progress and advise you of any appropriate modification to the <br /> budget. <br /> Migizi Group,Inc. <br /> .Peget-utzk-• �� F.11Gt7" <br />
The URL can be used to link to this page
Your browser does not support the video tag.