My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 RAILWAY AVE 2019-04-29
>
Address Records
>
RAILWAY AVE
>
2410
>
2410 RAILWAY AVE 2019-04-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 1:08:35 PM
Creation date
4/29/2019 1:08:32 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIGIORKS PERMIT Date Applied: 12/7/2018 <br /> "IIP#441*://o7A City of Everett Permit Services Public Works Permit#: PW1812-009 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: , <br /> _r- <br /> Everett,WA 98201 Planning Reference#: <br /> (425)257-8810 Public Works Fee: $45.00 <br /> 7 DEC 201d <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> PENSKE TRUCK LEASING CO LP MIGIZI GROUP INC. <br /> 2675 MORGANTOWN RD PO BOX 44840 <br /> READING, PA, 19607 TACOMA, WA, 98448 <br /> PHONE: PHONE: 2535379400 <br /> TAX PARCEL ID#: 00480100200800 SITE ADDRESS: 2410 RAILWAY AVE <br /> DESCRIPTION: 17 GEOTECHNICAL BORINGS FOR RIVERPOINT <br /> (6) Borings to nominal depths of 10ft along proposed extension of Railway Ave to north, plus 12-inch water line and 54-inch <br /> storm line. <br /> (11) Borings through 2410 Railway Ave (Penske Site) to vaious depths for planned vehicle servicing location. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 12/7/2( 8. <br /> Approved plans must remain on job-site at all times. ,_� ,___ ? c a <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starti .c pr§tr.8ctioifor a <br /> consultation All inspections (for final restoration and/or job completion) must be formally request .`"Ct5-2 -8881 to <br /> request a final inspection. ' co'co co <br /> 6. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. ` "'.` <br /> r._'� <br /> t_ <br /> 7. Protect all existing underground utilities during construction. '...C, 69 r.i, <br /> 8. A minimum of 5ft separation between City of Everett utilities and borings shall be maintained. ,!,.: , <br /> 9. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. �.';; <br /> 10. Noise from temporary construction sites is not allowed 10:00PM—7:00AM weekdays, 6:00PM :00AM weekender; <br /> unless a variance has been issued. Construction projects wishing a variance from the noise ordinar 'p must submit an2 <br /> application at least 30 days prior to commencingwork. Please visit the followingwebsite for mor o rmn: =' <br /> https://everettwa.gov/1547/Temporary-Noise-Variance-Requests �, 'm'fir'nT, <br /> Public Works Permit Fee Breakdown: °c; <br /> Misc. Minor Permits $25.00 1-... `7'' <br /> PW Site Inspection $20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> / / / harmless the City of Everett from any and all claims for damages,costs, <br /> IQ / i-I /g expenses,or causes of action that may arise because of installation and <br /> -,teall- 111 1 I maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Cons ruction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date <br /> AWIel-- 1 2/11 Zolff <br /> I Approved as Constructed (PW Inspector) S gnature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.