My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> and date of signature. Written releases shall be filed with the Engineer before the <br /> Completion Date will be established. <br /> 1-07.27 No Waiver of State's Legal Rights <br /> Delete 1-07.27 and substitute the following: <br /> 1-07.27 No Waiver of City's Legal Rights <br /> (******) <br /> The City shall not be precluded or estopped by any measurement, estimate, or certificate <br /> made either before or after the completion and acceptance of the Work and payment <br /> therefor from showing the true amount and character of the Work performed and materials <br /> furnished by the Contractor, or from showing that any such measurement, estimate, or <br /> certificate is untrue or incorrectly made, or that the Work or materials do not conform in fact <br /> to the Contract. The City shall not be precluded or estopped, notwithstanding any such <br /> measurement, estimate, or certificate, and payment in accordance therewith, from <br /> recovering from the Contractor and the Sureties such damages as it may sustain by reason <br /> of the Contractor's failure to comply with the terms of the Contract. Neither the acceptance <br /> by the Engineer nor any payment for the whole or any part of the Work, nor any extension <br /> of time, nor any possession taken by the City shall operate as a waiver of any portion of the <br /> Contract or of any power herein reserved or any right to damages herein provided, or bar <br /> recovery of any money wrongfully or erroneously paid to the Contractor. A waiver of any <br /> breach of the Contract shall not be held to be a waiver of any other or subsequent breach. <br /> The Contractor and the City recognize that the impact of overcharges to the City by the <br /> Contractor resulting from antitrust law violations by the Contractor's suppliers or <br /> Subcontractors adversely affects the City rather than the Contractor. Therefore, the <br /> Contractor agrees to assign to the City all claims for such overcharges. <br /> 1-07.28 - Not used- <br /> 1 1-07.29 Community Project Liaison (CPL) <br /> The Contractor will provide a full-time "construction liaison" (Community Project Liaison, <br /> CPL) primarily responsible for addressing the needs of residents, institutions, schools, <br /> businesses etc. within and adjacent to the project area or as may otherwise be affected by <br /> the construction activities. The CPL will interface with the City of Everett, and, in particular, <br /> the inspector and construction manager. The CPL's role is intended to provide a single, <br /> responsive point of contact for the public so as to minimize the involvement of the City staff <br /> in addressing issues that can readily be resolved directly by the Contractor. The CPL shall <br /> be readily accessible by telephone or in person during normal business hours and during <br /> all hours of work throughout the duration of the project. The CPL will be responsible for <br /> communicating to the City, any project information intended for the general neighborhood <br /> area, media or outside agencies. <br /> Examples of Construction Contractor and CPL responsibilities and interaction include, but <br /> are not limited to, the following: <br /> • CPL shall provide timely and regular communications with the City, residents, <br /> ' business/institution owners, and managers and any other persons affected by the <br /> construction to inform them of the status of scheduled work activities as needed. <br /> • If a complaint, question or issue should arise from the public (a resident, motorist, <br /> business owner etc.), that requires action by the Alverson Stormwater Separation <br /> Project construction team, the CPL shall communicate that information to the <br /> ' Alverson Stormwater Separation February, 2019 <br /> WO No-UP3660 Division 1 -GENERAL REQUIREMENTS <br /> SP-89 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.