My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERE T T SPECIAL PROVISIONS <br /> 4. To establish normal working hours for the Work; <br /> ' 5. To review safety standards and traffic control; and <br /> 6. To discuss such other related items as may be pertinent to the Work. <br /> The Contractor shall prepare and submit at the preconstruction meeting the following: <br /> 1. A Schedule of Values of all lump sum items; <br /> 2. A preliminary schedule of working drawing submittals; and <br /> ' 3. A list of material sources for approval if applicable. <br /> 1-08.0(2) Hours of Work <br /> Except in the case of emergency or unless otherwise required by 1-07.23(1) or <br /> ' otherwise noted and approved by the City, within these Special Provisions, the normal <br /> straight time working hours for the Contract shall be any consecutive 8-hour period <br /> between 7:00 a.m. and 6:00 p.m. of a working day with a maximum 1-hour lunch break <br /> ' and a 5-day work week. Should Contractor elect to work on a holiday or weekend, <br /> those normal working hours shall be from 9:00 a.m. to 6:00 p.m. The normal straight <br /> time 8-hour working period for the Contract shall be established at the preconstruction <br /> conference or prior to the Contractor commencing the Work. <br /> When connecting to existing water mains and services are required, the City will obtain <br /> all necessary permissions and the normal hours of work shall be any consecutive 8- <br /> hour period between 6:00 p.m. and 7:00 a.m. Refer to 7-09.3(19)A regarding night or <br /> weekend connection work time requirements. <br /> If a Contractor is required to or desires to perform Work on holidays, weekends, or <br /> before 7:00 a.m. or after 10:00 p.m. on any weekday, the Contractor shall apply in <br /> writing to the Engineer for permission to work such times. Permission to work longer <br /> than an 8-hour period between 7:00 a.m. and 6:00 p.m. is not required. Such requests <br /> shall be submitted to the Engineer no later than noon on the working day prior to the <br /> 1 day for which the Contractor is requesting permission to work, unless a noise variance <br /> will be required. In such case provide request a minimum of 30 days prior to <br /> performing the work in accordance with 1-07.1(1) NOISE. <br /> ' Permission to work Saturdays, Sundays, holidays or other than the agreed upon <br /> normal straight time working hours Monday through Friday may be given subject to <br /> certain other conditions set forth by the City or Engineer. These conditions may <br /> include, and not be limited to; requiring the Contractor to reimburse the City for the <br /> costs in excess of straight-time costs for City employees and necessary assistants who <br /> worked during such times, on non-Federal aid projects. Assistants may include, and <br /> are not be limited to, survey crews; personnel from the City's material testing lab; <br /> inspectors; and other City employees when in the opinion of the Engineer, such work <br /> necessitates their presence. The work performed on Saturdays, Sundays, and <br /> holidays will be considered as working days with regards to the Contract Time; and <br /> considering multiple work shifts as multiple working days with respect to Contract Time <br /> even though the multiple shifts occur in a single 24-hour period. <br /> 1-08.0(3) Reimbursement for Overtime Work of City Employees and <br /> ' Assistants <br /> Where the Contractor elects to work on a Saturday, Sunday, or holiday, or longer than <br /> an 8-hour work shift on a regular working day, as defined in the Standard <br /> Specifications, such work shall be considered as overtime work. On all such overtime <br /> work an inspector will be present, and a survey crew may be required at the discretion <br /> of the Engineer. If such work is the result of Contractor's inability to complete work or <br /> coordinate materials, equipment and labor in accordance with agreed schedule, then <br /> Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP—91 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.