I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Contractor shall provide sub-schedules to define major portions of the entire <br /> schedule. Include long-lead-time items for Equipment and material that requires <br /> long fabrication time. Order these well in advance of required delivery time to <br /> sequence with overall construction schedule. <br /> ' Each schedule shall show accumulated percentage of completion of each activity, <br /> and total percentage of Work completed, as of the date of payment application. <br /> Contractor shall include in each schedule as activities the submission, review, and <br /> correction of Submittals, Shop Drawings, Product Data and Samples. The <br /> schedule should show: <br /> 1. The dates for Contractor's Submittals. <br /> ' 2. A minimum of 14 calendar days duration for City or City's <br /> Representative's review. <br /> 3. Indicate decision data for selection of finishes. <br /> 4. Show Submittal preparation, submission, review, and breakdown at a <br /> minimum. Show individual parts of major Submittals. <br /> Contractor shall identify any and all Work furnished by City and installed by City <br /> on the construction schedule. <br /> 1-08.3(4) Measurement <br /> Delete 1-08.3(4). <br /> ' 1-08.3(5) Payment <br /> Delete 1-08.3(5) and substitute the following: <br /> ' Costs incurred in performance of this Work shall be included in the contract bid <br /> items and no direct compensation shall be paid. <br /> 1-08.4 Prosecution of Work <br /> ' Delete 1-08.4 and substitute the following: <br /> 1-08.4 Notice to Proceed and Prosecution of Work <br /> ******) <br /> The City will issue a Notice to Proceed after the Contract has been executed and the <br /> Contract Bond and evidence of insurance have been approved and filed by the City. The <br /> Contractor shall not commence with the Work until the Notice to Proceed has been given <br /> by the City. The Contractor shall commence construction activities on the Project site <br /> within 14 calendar days of the Notice to Proceed Date, unless otherwise approved in <br /> writing. The Contractor shall diligently pursue the Work to the Physical Completion Date <br /> within the time specified in the Contract. Voluntary shutdown or slowing of operations by <br /> the Contractor shall not relieve the Contractor of the responsibility to complete the Work <br /> within the time(s) specified in the Contract. <br /> The City is not obligated to accept or pay for Work performed by the Contractor or be liable <br /> ' for any Delays, prior to delivery of the Notice to Proceed. The City's knowledge of Work <br /> being performed prior to delivery of the Notice to Proceed will not obligate the City to <br /> accept or pay for such Work. Contractor waives any and all Contract Claims for an <br /> adjustment of Contract Sum or Contract Time arising out of, or related to, Work it performs <br /> prior to receipt of the Notice to Proceed. <br /> The City may issue partial Notices to Proceed. Contractor may seek permission in writing <br /> to perform some Work prior to issuance to the Notice to Proceed, such as shop drawings, <br /> equipment and material Submittals, or surveying and the City or City's Representative may, <br /> Alverson Stormwater Separation February, 2019 <br /> WO No-UP3660 Division 1 -GENERAL REQUIREMENTS <br /> SP-97 <br />