My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> in its sole discretion, approve in writing such Work prior to the issuance of the Notice to <br /> Proceed. <br /> Supplement 1-08.4 by adding the following: <br /> 1-08.4(1) Construction Progress <br /> (******) <br /> The Contractor shall furnish all labor, materials, facilities and Equipment necessary to <br /> ensure the prosecution and completion of the Project within the interim milestones, <br /> Substantial Completion, Physical Completion and Completion Dates of the Contract. If <br /> Work falls seven (7) calendar days or more behind the reviewed Preliminary Schedule, <br /> the Contractor agrees that, at its sole cost and expense, it will take all actions <br /> necessary to return the Project to the accepted schedule. These actions may include <br /> the following: <br /> a. Increase labor in quantities and crafts. <br /> b. Increase the number of working hours per shift, shifts per working day, <br /> working days per week, or the amount of Equipment, or any combination of <br /> the foregoing. <br /> c. Reschedule activities. <br /> If requested by the City's Representative, the Contractor shall prepare a proposed <br /> schedule revision demonstrating a plan to make up the lag in progress and insure <br /> completion of the Work within the Contract Time. All actions taken to return the Project <br /> 111 <br /> to the accepted schedule are at the Contractor's expense. <br /> The Contractor shall pay all costs incurred by the City that result from the Contractor's <br /> action to return the Project to its accepted schedule, including, but not limited to, <br /> additional. overtime, or third party inspection, design and construction management <br /> service costs. Contractor agrees that City shall deduct such charges from payments <br /> due the Contractor. It is further understood and agreed that none of the services 111performed by the City's Representative in monitoring, reviewing and reporting Project <br /> status and progress shall relieve the Contractor of responsibility for planning and <br /> managing construction Work in conformance with the construction schedule. <br /> 1-08.4(2) Work Sequencing ' <br /> (******) <br /> The intention of construction sequencing requirements and constraints is <br /> • To limit the size of the area disrupted by construction at any one time, <br /> • To limit impacts to local institutions, residents and businesses and, <br /> • To ensure that restoration occurs within a reasonable timeframe following <br /> pipeline installation. <br /> The work, as depicted on the plans and details and as described in the General <br /> Description and Location of Project at the beginning of Division 1, shall be constructed <br /> in a pre-planned sequence developed by the Contractor and shown in detail on the <br /> construction schedule as defined in Section 1-08.3. Pipelines shall be constructed <br /> beginning at the downstream end and progressing upstream. <br /> 1-08.4(3) Special Construction Constraints <br /> (******) <br /> Refer to 1-08.0(2) for work hours. <br /> Refer to 1-07.23(1) for construction under traffic and 1.07.23(1)A for general traffic <br /> requirements. <br /> Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP—98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.