My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS <br /> records, shall be retained and open to similar inspection or audit for the same period of <br /> ' time. The audit may be performed by employees or representatives of the City or by <br /> an auditor chosen by the City. The Contractor, Subcontractors, or lower tier <br /> subcontractors shall provide adequate facilities, reasonably acceptable to auditor, for <br /> ' the audit during normal business hours. The Contractor, Subcontractors, or lower tier <br /> subcontractors shall make a good faith effort to cooperate with the auditors. If an audit <br /> is to be commenced more than 60 calendar days after the Final Acceptance date of the <br /> Contract, the Contractor will be given 20 calendar days' notice of the time when the <br /> ' audit is to begin. If any litigation, claim, or audit arising out of, in connection with, or <br /> related to this Contract is initiated. the Project records shall be retained until the later of <br /> (a) completion of litigation, claim, or audit or (b) six years after the date of Final <br /> ' Acceptance. <br /> 1-09.12(2) Claims <br /> All Contract Claims filed against the City shall be subject to audit at any time following <br /> ' the filing of the Contract Claim. Failure of the Contractor, Subcontractors, or lower tier <br /> subcontractors to maintain and retain sufficient records to allow the auditors to verify <br /> all or a portion of the Contract Claim or to permit the auditor access to the books and <br /> ' records of the Contractor, Subcontractors, or lower tier subcontractors shall constitute <br /> a waiver of a Contract Claim and shall bar recovery in connection with the Contract. <br /> 1-09.12(3) Required Documents for Audits <br /> An audit may be performed by employees of the City or a representative of the City. <br /> The Contractor and its Subcontractors shall provide adequate facilities acceptable to <br /> the City for the audit during normal business hours. The Contractor and all <br /> ' Subcontractors shall cooperate with the City's auditors. <br /> As a minimum, the auditors shall have available to them the following documents: <br /> 1. Daily time sheets and supervisor's daily reports. <br /> ' 2. Collective Bargaining Agreements. <br /> 3. Insurance, welfare, and benefit records. <br /> 4. Payroll registers. <br /> 5. Earnings records. <br /> 6. Payroll tax forms. <br /> I 7. Material invoices and requisitions. <br /> 8. Material cost distribution worksheet. <br /> 9. Equipment records (list of company equipment, rates, etc.) <br /> 10. Vendors', rental agencies', Subcontractors' and lower tier subcontractors' <br /> invoices. <br /> 11. Contracts between the Contractor and each of its Subcontractors, and all <br /> ' lower tier subcontractor contracts and supplier contracts. <br /> 12. Subcontractors' and lower tier subcontractors' payment certificates. <br /> 13. Canceled checks, including payroll and vendors. <br /> ' 14. Job cost reports, including monthly totals. <br /> 15. Job payroll ledger. <br /> 16. General ledger. <br /> - 17. Cash disbursements journal. <br /> Alverson Stormwater Separation February, 2019 <br /> WO No-UP3660 Division 1 -GENERAL REQUIREMENTS <br /> SP-125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.