My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> of dimensions defined in the Work or shown on the Plans, Standard Specifications, Section <br /> 5-06 of these Special Provisions, or as otherwise approved by the Engineer. The <br /> measurement and payment limits for measuring the width of this bid item shall not exceed <br /> the saw-cut limits shown on the Drawings. No deduction will be made for the weight of <br /> asphalt binder, blending sand, mineral filler, or other component of the mixture. <br /> The unit price for this bid item shall include all labor, materials, equipment and related work <br /> necessary to furnish, machine-place, compact, and perform density tests on multiple lifts of <br /> HMA — CL 1/2" PG 64-22 pavement in trench patches, and shall also include removal and <br /> disposal of existing asphalt and base materials within the area to be patched. Also <br /> included in this item is any adjustment of existing catch basin grates, valve boxes, junction <br /> boxes, or any other street iron encountered in the patch area. Crushed surfacing will be <br /> measured and paid separately. <br /> Furnishing and applying tack coat, prime coat, joint seal and crack sealing asphalt is to be <br /> included in this bid item with no direct compensation made. All costs for "Anti Stripping <br /> 1 Additive" and "Compaction Adjustment" shall be included in the unit contract price per ton of <br /> the HMA with no direct compensation made. <br /> Bid Item 24 - Temporary Asphalt Sidewalk and Curb <br /> Measurement and Payment: Unit Price per Square Yard <br /> Measurement for Temporary Asphalt Sidewalk and Curb shall be by the square yard, as <br /> delineated by the contractor and approved by the Inspector. Measurement shall be for <br /> HMA placed in areas shown on the Plans as replacement of sidewalk and curb areas, or as <br /> directed by the Inspector, in accordance with the Standard Specifications and Section 5-04 <br /> of these Special Provisions. <br /> The unit price for this bid item shall include all labor, materials, equipment and related work <br /> necessary to furnish, machine-place, compact, roll and perform any hand work necessary <br /> to meet contract requirements, and shall also include removal and disposal of all existing <br /> sidewalk, curb, and pavement within the construction limits of this item. <br /> All costs for"Anti Stripping Additive" and "Compaction Adjustment" shall be included in the <br /> unit contract price with no direct compensation made. <br /> Bid Item 25 - Concrete Sidewalk Restoration <br /> Measurement and Payment: Unit Price per Square Yard. <br /> Measurement shall be per square yard as delineated by the Contractor and approved by <br /> the Inspector prior to removal. <br /> The unit price per square yard for restoration of existing concrete sidewalks shall be full <br /> compensation for all materials, tools, labor and equipment necessary to complete the work <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Removal and disposal of existing sidewalk and base materials is also <br /> included in this item. Crushed surfacing top course placed under sidewalk is incidental to <br /> the sidewalk restoration item. <br /> ' Bid Item 26 - Concrete Driveway Restoration <br /> Measurement and Payment: Unit Price per Square Yard. <br /> Measurement shall be per square yard as delineated by the Contractor and approved by <br /> the Inspector prior to removal. <br /> The unit price per square yard for restoration of existing concrete driveways shall be full <br /> compensation for all materials, tools, labor and equipment necessary to complete the Work <br /> ' Alverson Stormwater Separation Division B—BID ITEM DESCRIPTIONS February, 2019 <br /> WO No—UP3660 SP -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.