My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications, and these <br /> Special Provisions. Removal and disposal of existing driveway and base materials is also <br /> included in this item. Crushed surfacing top course placed under driveway is incidental to <br /> the driveway restoration item. <br /> Bid Item 27 - Concrete Curb and Gutter, Type A-1 I <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> The unit price per linear foot for construction of concrete curb and gutters shall be full <br /> compensation for all materials, tools, labor and equipment necessary to construct new curb <br /> and gutter in place in accordance with the Plans, COE Standard Drawings, Standard <br /> Specifications and these Special Provisions. Removal and disposal of existing curb, gutter, <br /> and base materials is also included in this item. Crushed surfacing top course placed <br /> under curb and gutter is incidental to the curb item. <br /> Removal and disposal of existing curb and base materials is included in this item. <br /> Bid Item 28 - Concrete Curb, Type E-1 ' <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> Measurement shall be per linear foot along the line and slope of the completed curb as <br /> approved by the Inspector. <br /> The unit price per linear foot for construction of curb shall be full compensation for all <br /> materials, tools, labor and equipment necessary to construct new curb and gutter in place <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Removal and disposal of existing curb and base materials is included <br /> in this item. Asphalt tack coat placed under curb is incidental to this bid item. <br /> Bid Item 29 - Extruded Asphalt Curb , <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> Measurement shall be per linear foot along the line and slope of the completed curb as I <br /> approved by the Inspector. <br /> The unit price per linear foot for construction of curb shall be full compensation for all <br /> materials, tools, labor and equipment necessary to construct new curb and gutter in place I <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Asphalt tack coat placed under curb is incidental to this bid item. <br /> Bid Item 30 - Force Account I <br /> Measurement and Payment: Force Account <br /> This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br /> ACCOUNT; except, as modified below. <br /> The Force Account bid item has been included for specific miscellaneous work items listed <br /> below and for any additional work directed by the Engineer that is not required by the <br /> original Contract and to address changed conditions or unanticipated work. The amount <br /> indicated in the Proposal for this bid item is to provide a common bid amount. The actual <br /> amount paid under this bid item may vary from no payment to the full amount of the bid <br /> item. Work performed under this bid item will be initiated with a work directive issued by <br /> the Engineer. <br /> Alverson Stormwater Separation Division B—BID ITEM DESCRIPTIONS February, 2019 <br /> WO No—UP3660 SP -10 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.