My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 <br /> This Work applies to street pavement patching and street reconstruction after <br /> completion of utility work. Grading for street reconstruction shall conform to COE <br /> Standard Drawing No. 302, unless otherwise noted on the Plans. Grading for <br /> pavement patching shall conform to COE Standard Drawing No. 316, unless otherwise <br /> ' noted on the Plans. <br /> 2-03.2 Vacant <br /> Delete 2-03.2 and substitute the following: <br /> 2.03.2 Materials <br /> Materials shall meet the requirements of the following: <br /> ' Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Gravel Borrow 9-03.14(1) Standard Specifications <br /> 2-03.3 Construction Requirements <br /> ' Supplement 2-03.3 by adding the following: <br /> Blasting is not allowed within the City limits of Everett. <br /> Use suitable excavated material for roadway embankments. Dispose of surplus <br /> ' excavated material or unsuitable material in accordance with 2-03.3(7). <br /> Engineer will not approve payment for unauthorized excavation or embankment. or <br /> both, beyond the limits indicated on the Plans. Return areas of unauthorized <br /> ' excavation or embankment; or both. to their original conditions or better at the <br /> Contractor's expense. <br /> Fine grading in fill or backfill areas shall begin within the top six inches of subgrade. <br /> Final grading shall produce a uniform surface within established tolerances and without <br /> abrupt changes in grade. <br /> Construction requirements for pavement patching authorized by Engineer outside of <br /> ' Project limits shall be in accordance with the Section 5-04 and City Standard Drawing <br /> No. 316 for existing asphalt concrete over prepared grade. <br /> Provide temporary drainage to keep the subgrade free from standing water. <br /> Ensure the top six inches of subgrade is free from rocks or cemented lumps larger <br /> than 2-1/2 inches in greatest dimension. <br /> Excavate for curbs and gutters by accurately cutting to the cross-sections, grades, and <br /> ' elevations shown. Take care not to excavate below the specified grades. Maintain all <br /> excavations free from accumulation of detrimental quantities of leaves, brush, sticks, <br /> trash, and other debris. <br /> 2-03.3(2) Rock Cuts <br /> Delete entire subsection "Controlled Blasting." <br /> 2-03.3(3) Excavation Below Subgrade <br /> Supplement 2-03.3(3) by adding the following: <br /> Proof Rolling. Proof roll subgrade under the roadway with a fully loaded tandem <br /> truck following trench backfilling and grading to subgrade to identify soft or loose <br /> ' areas in the subgrade. In areas where the subgrade does not stand up to the <br /> proof roll, over excavate the subgrade and replace with imported Foundation <br /> Material Class A or B or Gravel Borrow, as determined by the Engineer, to bring <br /> ' the subgrade up to the proper compaction and grade. Compact backfill material in <br /> accordance with 2-03.3(3). <br /> Alverson Stormwater Separation Division 2-EARTHWORK February, 2019 <br /> WO No. -UP3660 SP-137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.