Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-03.3(7) Disposal of Surplus Material <br /> 2-03.3(7)C Contractor-Provided Disposal Site <br /> Delete the first paragraph of 2-03.3(7)C and substitute the following: <br /> Make arrangements for disposal of surplus and other materials. All costs for <br /> disposal of surplus and other materials shall be included with the respective <br /> Bid items of the Contract with no direct compensation being made. <br /> 2-03.4 Measurement <br /> Delete all paragraphs under 2-03.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Items Descriptions and provided in Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-03.5 Payment <br /> Delete all paragraphs under 2-03.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> There will be no direct compensation made for haul on material moved within or from <br /> the Project site and the Contractor shall include the cost of hauling in his various unit <br /> contract prices. <br /> There will be no direct compensation made for "Proof Rolling" as required in this <br /> section for excavated portions of the roadway and the Contractor shall include costs in <br /> his various unit Contract prices. <br /> Payment for over excavation below subgrade and disposal of over excavated materials <br /> as required in this section shall be included in the Bid item for Foundation Material. <br /> Imported material required in this section shall be paid for by the unit Bid price for that <br /> material. Payment for placement and compaction of import material shall be included <br /> in the unit price per ton of import material. <br /> 2-04 HAUL <br /> 2-04.1 Description <br /> Delete the first paragraph of 2-04.1 and substitute the following: <br /> This Work shall consist of transporting excavated material from its original site to its <br /> final place on the Project or to a Contractor arranged waste site. <br /> 2-04.3 Vacant <br /> Delete 2-04.3 and substitute the following: <br /> 2-04.3 Construction Requirements <br /> Off-highway earth-moving equipment shall not haul on or across streets, roadways, <br /> driveways, trails, sidewalks or parking lots not being improved in the Contract. <br /> 2-04.4 Measurement <br /> Haul work will not be measured. ' <br /> 2-04.5 Payment <br /> All costs for the Work described in Section 2-04 shall be included with excavation work with <br /> 1 <br /> no direct compensation made. <br /> Alverson Stormwater Separation Division 2—EARTHWORK February, 2019 <br /> WO No. -UP3660 SP—138 <br />