Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 5-04.3(8) Mixing <br /> Section 5-04.3(8)A1 is deleted and replaced with the following: <br /> 5-04.3(8)A1 General <br /> ' Acceptance of all HMA shall be undercommercial evaluation. <br /> The mix design will be the initial JMF for the class of HMA. The Contractor <br /> ' may request a change in the JMF. Any adjustments to the JMF will require <br /> the approval of the Project Engineer and must be made in accordance with <br /> Section 9-03.8(7). <br /> Sampling and testing of HMA accepted by commercial evaluation will be at <br /> the option of the Project Engineer. Commercial HMA can be accepted by a <br /> contractor certificate of compliance letter stating the material meets the HMA <br /> requirements defined in the contract. <br /> 5-04.3(8)A4 Definition of Sampling Lot and Sublot <br /> Supplement 5-04.3(8)A4 with the following: <br /> For HMA in a structural application, sampling and testing for total project <br /> quantities less than 400 tons is at the discretion of the City Inspector. For <br /> HMA used in a structural application and with a total project quantity less than <br /> ' 800 tons but more than 400 tons, a minimum of one acceptance test shall be <br /> performed: <br /> 1. If test results are found to be within specification requirements, <br /> additional testing will be at the City Inspector's discretion. <br /> 2. If test results are found not to be within specification <br /> requirements. additional testing as needed to determine a CPF <br /> shall be performed. <br /> ' 5-04.3(8)A5 Test Results <br /> Delete the first paragraph of 5.04.3(8)A5. <br /> ' 5-04.3(8)A6 Test Methods <br /> Delete 5-04.3(8)A6 and replace it with the following: <br /> 5-04.3(8)A6 Test Methods <br /> ' Testing of HMA for compliance of Va will be at the option of the City. If tested, <br /> compliance of Va will be use WSDOT Standard Operating Procedure SOP <br /> 731. Testing for compliance of asphalt binder content will be by WSDOT FOP <br /> . for AASHTO T 308. Testing for compliance of gradation will be by WAQTC <br /> FOP for AASHTO T 27/T 11. <br /> Section 5-04.3(14) is deleted and replaced by the following: <br /> ' 5-04.3(14) Planing Bituminous Pavement <br /> The Contractor shall call for locates before planing any HMA pavement. Any <br /> induction loop vehicle detectors which are within the planing area shall be <br /> discussed with the inspector prior to planing to see if the planing limits can be <br /> modified to save the loops. Any loops which are damaged in the planing <br /> process shall be replaced prior to the final overlay. The electrical <br /> subcontractor shall be on-call and the loops shall be replaced within 72 hours <br /> ' of the planing operation. Loops which will definitely be lost to the planing <br /> operation may be replaced prior to planing by placing the new loops well <br /> below or outside the planing area. See Section 8-20 of the Specifications for <br /> details on loop installation and payment. <br /> Alverson Stormwater Separation February 2019 <br /> WO No. -UP3660 Division 5—SURFACE TREATMENTS AND PAVEMENTS <br /> SP- 147 <br />