My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 5-06 PAVEMENT PATCHING <br /> 5-06.1 Description <br /> ' This Work shall consist of the reconstruction and patching of trenches and other <br /> excavations in paved streets and other paved areas. <br /> 5-06.2 Materials <br /> Provide materials conforming to the requirements specified for the materials in Sections 5- <br /> 04 & 5- 05 of the Standard Specifications except as modified by these Special Provisions. <br /> For HMA pavement patching provide HMA CL 1/2". PG 64-22 as specified in Section 5-04 <br /> of the Standard Specifications. <br /> For tack coat provide emulsified asphalt grade CSS-1 as specified in 9-02.1(6) of the <br /> Standard Specifications. <br /> For cement concrete pavement patching provide Type Ill (H.E.S.) with minimum 4,000 psi <br /> 28-day compressive strength and having curing time of five days. <br /> ' Provide crushed surfacing top course used for pavement patching conforming to the <br /> requirements of 9-03.9(3) of the Standard Specifications. <br /> 5-06.3 Construction Requirements <br /> 5-06.3(1) General <br /> Schedule pavement patching to accommodate the demands of traffic and perform as <br /> rapidly as possible to provide maximum safety and convenience to public traffic. <br /> ' Placing and compact the trench backfill and the preparation and compaction of the <br /> subgrade in accordance with the various applicable sections of the Standard <br /> Specifications except as modified by these Special Provisions. <br /> Before the pavement patch is to be constructed saw cut the pavement so that the <br /> marginal edges of the patch will form a rectangular shape with straight edges and <br /> vertical faces. <br /> Provide signs, barricades, lights and other warning devices in accordance with the <br /> requirements of the "Manual on Uniform Traffic Control Devices" and maintain 24- <br /> hours a day until the patching work is completed and ready for traffic. <br /> E Complete subgrade compaction prior to the required patching. Compact subgrade to <br /> 95-percent as determined by the ASTM D2922 (nuclear method). <br /> 5-06.3(2) Cement Concrete Pavement <br /> After the Crushed Surfacing Top Course subgrade for the pavement has been <br /> constructed and compacted to line and grade, the cement concrete pavement patch <br /> shall be placed and struck off to a thickness of one inch greater than the existing <br /> ' pavement or eight inch minimum thickness, whichever is greater. Perform all Work in <br /> accordance with Section 5-05 of the Standard Specifications, except as modified by <br /> these Special Provisions and Standard Drawing No. 316. <br /> Place through joints and dummy joints to match existing or as directed by the <br /> Engineer. Finish and brush the surface of the concrete patch with a fiber brush. Place <br /> approved curing compound on the finished concrete immediately after finishing. <br /> ' 5-06.3(3) Cement Concrete Pavement Resurfaced with HMA <br /> Patch streets having cement concrete pavements surfaced with HMA as shown on <br /> Standard Drawing No. 316. <br /> Alverson Stormwater Separation February 2019 <br /> WO No. -UP3660 Division 5-SURFACE TREATMENTS AND PAVEMENTS <br /> SP -149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.