My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 7 — DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, <br /> WATER MAINS, AND CONDUITS <br /> 7-01 DRAINS <br /> Delete section 7-01 and replace with the following: <br /> All storm drain pipe shall be provided and constructed in accordance with section <br /> 7-04 and 7-08. <br /> ' 7-04 STORM SEWERS <br /> 7-04.1 Description <br /> ' Revise the first paragraph in 7-04.1 to read as follows: <br /> This Work consists of constructing storm sewers to lines and grades as shown on the <br /> Plans and in accordance with COE Standard Drawings, the Standard Specifications <br /> and these Special Provisions. <br /> Supplement 7-04.1 as follows: <br /> 7-04.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-04.2 Materials <br /> Delete the first and second paragraphs in 7-04.2 and substitute the following: <br /> Materials shall meet the requirements of the following sections: <br /> Solid Wall PVC Storm Sewer Pipe 9-05.12(1) Special Provisions <br /> (Allowed only where 3 feet of cover, minimum, is provided) <br /> ' Ductile Iron Pipe 9-05.13 Special Provisions <br /> Corrugated Polyethylene Storm Sewer 9-05.20 Special Provisions <br /> Pipe, Couplings, and Fittings <br /> Corrugated Polypropylene <br /> Storm Sewer Pipe 9-05.24 Special Provisions <br /> Revise the last paragraph in 7-04.2 to read as follows: <br /> Unless pipe material is specified in the Plans, provide the specified schedule and <br /> diameter of either Ductile Iron (DI), Solid Wall PVC (PVC), Polyethylene (PE), or <br /> Polypropylene (PP) materials as listed above. <br /> Contact the Olympia Service Center Materials Laboratory to determine if joints have <br /> been approved for pipe diameters larger than those listed. <br /> On the web at: http://wnrw.wsdot.wa.gov/biz/mats/QPL/QPl.cfm <br /> Or by mail at: <br /> P.O. Box 167 <br /> Olympia, WA 98507-0167 <br /> (360) 709-5442 <br /> 7-04.3 Construction Requirements <br /> Add the following: <br /> 7-04.3(1)G Cleaning and Testing <br /> 7-04.3(1)G1 Deflection Test for Thermoplastic Pipe <br /> Alverson Stormwater Separation February, 2019 <br /> WO No. -UP3660 Division 7—STORM, SEWER,WATER <br /> SP-153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.