My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> After trench backfill and compaction are completed, perform deflection testing if <br /> CCTV testing reveals thermoplastic pipe being out of round. <br /> 7-04.3(1)G2 Television Inspection <br /> After trench backfill and compaction are completed the City will use their CCTV <br /> camera to inspect the interior of mains and the interior of existing lines having <br /> Contractor installed new structures or side sewers or both. Provide the City with <br /> a three-business-day notice for each CCTV request. Begin final roadway <br /> surfacing AFTER notice from City Inspector of City Sewer Department approval <br /> of the CCTV inspection. ' <br /> Prior to arranging with City for CCTV inspection, perform the following: <br /> Clean lines and structures of all debris, <br /> Channel manhole inverts <br /> Adjust catch basin sump depth, where required in the plans <br /> Seal pipes entering structures according to these Special Provisions. <br /> Correct deficiencies noted by the City Inspector and the CCTV inspection results <br /> to the satisfaction of the Engineer. <br /> City will bear initial inspection costs. Contractor shall be responsible for re- <br /> inspection costs if CCTV equipment will not pass through the lines or structures <br /> on initial inspection. City will deduct cost for follow-up re-inspection after <br /> correction of deficiencies from Contractor's final payment on a direct cost basis. <br /> 7-04.3(1)H Final Acceptance <br /> City will require successful completion of the following items prior to issuing final <br /> acceptance, including, but not limited to: <br /> 1. Passing low pressure air testing. <br /> 2. Backfill and compaction in accordance with COE Standard Drawings No. 614, <br /> 615, and 620. <br /> 3. Line and grade to the tolerance of 7-08.3(2)B. <br /> 4. Manhole, inlet, and catch basin to the invert elevation, and cleaned. 1115. Manhole, inlet, and catch basin casting set to final grade. <br /> 6. Manhole, inlet, and catch basin construction in accordance with 7-05.3. <br /> 7. Lines free of debris and obstructions. <br /> 8. Bell and spigot joints properly seated as evidenced by successful completion of <br /> CCTV testing. <br /> 9. HDPE bead removal, where required, is accomplished without leaving sharp and <br /> jagged edges. I <br /> 7-04A Measurement <br /> Delete the first paragraph of 7-04.4 and substitute the following: I <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-04.5 Payment <br /> Delete all paragraphs in 7-04.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-05 MANHOLES, INLETS, AND CATCH BASINS <br /> 7-05.1 Description <br /> Revise the first paragraph in 7-05.1 to read as follows: I <br /> Alverson Stormwater Separation February, 2019 <br /> WO No. -UP3660 Division 7—STORM, SEWER,WATER <br /> SP-154 I <br />