My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Type 1 and 1L Catch Basins and COE Standard Drawing 610 for Type 2 Catch <br /> Basins. <br /> 7-05.4 Measurement <br /> Delete all paragraphs of 7-05.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-05.5 Payment <br /> Delete all paragraphs of 7-05.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS <br /> 7-08.2 Materials <br /> Delete material items listed in 7-08.2 and substitute the following: <br /> Provide materials meeting the following requirements: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Gravel Borrow 9-03.14(1) Standard Specifications <br /> Controlled Density Fill <br /> 2-09.3(1)E Special Provisions <br /> Crushed Surfacing Base Course 9-03.9(3) Standard Specifications <br /> 7-08.3 Construction Requirements <br /> 7-08.3(1) Excavation and Preparation of Trench <br /> 7-08.3(1)A Trenches <br /> Revise the second paragraph in 7-08.3(1)A to read as follows: <br /> ' Excavate trench in accordance with COE Standard Drawing No 614. <br /> Delete the second sentence in the third paragraph in 7-08.3(1)A and substitute the <br /> following: <br /> 1 Contractor may excavate above the top of the pipe zone only as wide as <br /> necessary to meet OSHA requirements. <br /> 7-08.3(1)C Bedding the Pipe <br /> Delete the second and third paragraphs in 7-08.3(1)C and substitute the following: <br /> Provide pipe zone bedding in accordance with COE Standard Drawing 614, <br /> 615 and 620. All structural fill material placed as pipe zone bedding shall be <br /> 1111 crushed surfacing base course conforming to section 9-03.9(3) of the <br /> Standard Specifications. <br /> Supplement 7-08.3(1) by adding the following: <br /> 7-08.3(1)D Trench Dewatering <br /> This section specifies the definition, responsibilities and execution for dewatering <br /> associated with trench excavation for pipes, manholes, catch basins, cleanouts, <br /> side sewers and other buried utility work. Implement trench dewatering measures <br /> where necessary or directed by the Engineer. Implementation shall include, but <br /> not be limited to, the design, furnishing, installation, operation, maintenance, <br /> monitoring, reporting and removal of dewatering systems to achieve proper <br /> completion of Work performed under this Contract. <br /> Alverson Stormwater Separation February, 2019 <br /> WO No. -UP3660 Division 7—STORM, SEWER,WATER <br /> SP—157 <br />
The URL can be used to link to this page
Your browser does not support the video tag.