My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> mechanical or electrical failure of the dewatering system shall be Contractor's <br /> responsibility to repair at no cost to the City. <br /> Trench dewatering shall be included with the Work required for Storm Drain Pipe, <br /> Manholes, Inlets, Storm Drain, Catch Basins, Utility Restoration or other <br /> excavation activity performed as part of this Contract with no direct compensation <br /> made. <br /> 7-08.3(2)A Survey Line and Grade <br /> Delete both paragraphs of 7-08.3(2)A and substitute the following: <br /> tProvide surveys required to construct the sewer line including, but not limited <br /> to, alignment stakes, offset stakes, grade hubs, and intermediate staking. <br /> Use main survey control points shown on the Plans, unless Engineer directs <br /> otherwise. If a Bid item for "Surveying" is not listed in the Proposal, then this <br /> item shall be included with the Work with no direct compensation made. <br /> Provide laser control equipment approved by the Engineer for setting pipe <br /> grades. <br /> 7-08.3(2)1 Side Sewer Connections <br /> Supplement 7-08.3(2)1 by adding the following: <br /> Make typical side sewer connections in accordance with COE Standard <br /> Drawing No. 602. <br /> 7-08.3(2)J Pipe Separation Pads <br /> Where vertical clearance between a proposed pipe and any other underground <br /> utility is 2 to 6 inches a pipe separation pad is required. The pad shall be 2 feet x <br /> 2 feet x 2 inches minimum, and placed between the pipes. The pad shall be <br /> Ipolyethylene (Dow Plastics Ethafoam 220), or approved equal. <br /> Pipe separation pads shall be included with the Work required for Storm Drain <br /> pipe, performed as part of this Contract with no direct compensation made. <br /> 7-08.3(3) Backfilling <br /> Delete the first paragraph of 7-08.3(3) and substitute the following: <br /> Perform trench backfilling only after inspection and approval of the installed pipe <br /> bedding zone backfill. Refer to COE Standard Drawing No. 614. 615. 620 and the <br /> Plans for typical trench section backfill and compaction requirements. <br /> If the Engineer determines native material is not suitable for use as trench backfill, <br /> use "Gravel Borrow" conforming to 9-03.14(1) of the Standard Specifications. <br /> If there is an excess of suitable backfill material obtained from trench excavation <br /> at one location on the project, use it at other locations on the project or dispose of <br /> at an approved disposal site. The cost of transporting the excess backfill material <br /> is considered incidental to the Contract with no direct compensation made. <br /> Use Controlled Density Fill for fill above pipe zone at street crossings if directed by <br /> the Engineer. <br /> 7-08.3(4) Plugging Existing Pipe <br /> ' Delete the first paragraph of 7-08.3(4) and substitute the following: <br /> Where shown on the plans to plug and seal existing water main, sanitary sewer <br /> and storm drainage pipe or where designated by the Engineer, existing pipes shall <br /> be plugged on the inlet end for a distance of 2 feet with commercial concrete and <br /> abandoned in place. Care shall be used in placing the concrete in the pipe to see <br /> that the opening of the pipe is completely filled and thoroughly plugged. <br /> Alverson Stormwater Separation February, 2019 <br /> WO No. -UP3660 Division 7-STORM, SEWER,WATER <br /> ' SP-159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.