Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-08.4 Measurement <br /> Delete all paragraphs in 7-08.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-08.5 Payment <br /> Delete all paragraphs in 7-08.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-18 SIDE SEWERS 1 <br /> 7-18.1 Description <br /> Delete the first paragraph in 7-18.1 and substitute the following: <br /> This Work consists of constructing side sewers, within the right of way in accordance <br /> with the Plans, the Specifications, these Special Provisions and the COE Standard <br /> Drawings at locations staked. The construction of side sewers includes rerouting of <br /> existing side sewers, where the side sewer conflicts with the proposed storm drain, at <br /> locations called out in the plans, or at locations directed by the engineer. <br /> In some cases, minor adjustments in side sewer location and length will be required to <br /> adapt to field conditions. <br /> 7-18.2 Materials <br /> Supplement 7-18.2 by adding the following: <br /> Provide materials meeting the following requirements. <br /> Inserta-Tee 9-05.22 Special Provisions <br /> Gasketed PVC Saddle 9-05.12(3) Special Provisions <br /> Stainless Steel Clamp 9-05.23 Special Provisions <br /> 7-18.3 Construction Requirements <br /> Further supplement 7-18.3 by adding the following: <br /> 7-18.3(6) Contractor Submittals <br /> (******) <br /> Submit all procedures or material descriptions requiring the Engineer's approval not <br /> less than 15 calendar days prior to mobilizing or commencing side sewer reroute <br /> activities at the Site. Include shop drawings for side sewer pipe, fittings, cleanouts, <br /> adapters, castings, couplings, method of connection to the main, information on the <br /> CCTV and locating equipment, sample CCTV inspection report and sample public <br /> notice with Submittal. <br /> Following side sewer connection and inspection work submit videotapes, inspection <br /> reports. and record drawing sketches of the side sewer replacement and inspection. <br /> Submit inspection information on a color, digital DVD with on-screen footage counter <br /> and site address of each side sewer together with a written CCTV inspection report. <br /> Re-inspect the side sewer, at no expense to the Owner, if video quality is not <br /> acceptable as determined by the Engineer. Reset the on-screen footage counter to <br /> zero at the beginning of each side sewer inspection. <br /> 7-18.3(7) CCTV <br /> (******) <br /> For the CCTV inspection locate and identify all branch connections to the existing side <br /> sewer including drains, basement and foundation drains, and all other connections. I <br /> Alverson Stormwater Separation February, 2019 <br /> WO No. -UP3660 Division 7—STORM, SEWER,WATER <br /> SP-160 , <br />