My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-19 SEWER CLEANOUTS <br /> 7-19.1 Description <br /> 111 <br /> Revise the first paragraph in 7-19.1 to read as follows: <br /> This Work consists of constructing sewer cleanouts within the right of way in <br /> accordance with the Plans, the Specifications, these Special Provisions and the COE <br /> Standard Drawings at locations staked. <br /> Install side sewer cleanout at the right-of-way line for new side sewers in accordance <br /> with COE standard drawing 601. <br /> 7-19.2 Materials <br /> Supplement 7-19.2 by adding the following: <br /> Provide materials meeting the following requirements. I <br /> Metal Frame and Cover 9-05.15(4) Special Provisions <br /> 7-19.3 Construction Requirements <br /> Supplement 7-19.3 by adding the following: <br /> Provide cleanout in accordance with COE Standard Drawing 604. <br /> 7-19.4 Measurement <br /> Delete first paragraph of 7-19.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-19.5 Payment <br /> Delete all paragraphs of 7-19.5 and substitute the following: I <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Alverson Stormwater Separation February, 2019 <br /> WO No. -UP3660 Division 7—STORM, SEWER,WATER <br /> SP—162 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.