Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Accomplish location of the side sewer pipe by using a suitable sonde transmitter <br /> attached to the camera. Provide temporary markers positioned on the ground surface <br /> and to measure accurately from to create a record drawing sketch and a photograph. <br /> Provide CCTV equipment approved by the Engineer before inspection begins. Provide <br /> CCTV equipment with the following minimum criteria: <br /> a. Self-contained color television cameras with footage counter, color monitor, <br /> three-wire coaxial cable, power sources, and other equipment. <br /> b. Waterproof camera having a minimum 650 line resolution capable of <br /> ' inspecting side sewers 3-inches to 6-inches in diameter and up to 200 feet in <br /> length. <br /> c. Operate in 100% humidity. <br /> d. Camera lighting that minimizes relative glare. <br /> e. Picture quality providing a clear, in-focus color picture of the entire pipeline <br /> periphery for all work conditions. <br /> f. Equipped with a centering device to ensure view of full pipe diameter. <br /> g. Capable of traveling upstream or downstream at a steady uniform rate, <br /> stopping where necessary to ensure a proper assessment of pipe defects, <br /> blockages, direction changes, material changes, and branch connections. <br /> If the camera fails to pass through the side sewer within City right-of-way, temporarily <br /> suspend inspection and notify the Engineer of the obstruction. The Engineer may <br /> direct the Contractor on further actions. <br /> ' 7-18.3(8) Record Drawing Sketch <br /> (******) <br /> Prepare record drawing sketch for each side sewer connection and inspection using a <br /> City-furnished aerial photograph as a base plan, indicating the location, extent, depth <br /> and materials associated with the side sewer connection and the alignment, <br /> connections and defects encountered during CCTV inspection of the existing side <br /> sewer. Where necessary for clarity, take photographs of ground surface of the site, <br /> prepare an 8-1/2 inch x 11-inch print of the photo and mark locations of pipe, bends, <br /> fittings and defects. <br /> In addition, inspect and document field observations associated with each side sewer <br /> pipe including, but not limited to, existing pipe material, pipe diameter, joint type, joint <br /> integrity, extent of pipe deterioration, grade and alignment, bedding and backfill, root <br /> intrusion, and debris accumulation. <br /> 7-18.4 Measurement <br /> Delete first paragraph of 7-18.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-18.5 Payment <br /> Delete all paragraphs of 7-18.5 and substitute the following: <br /> ' Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Side sewer construction, where called out on the plans, shall be included with the <br /> Work required for Storm Drain Pipe, Inlets, Storm Drain, Catch Basins, or other <br /> excavation activity performed as part of this Contract with no direct compensation <br /> I made. <br /> Alverson Stormwater Separation February, 2019 <br /> WO No. -UP3660 Division 7—STORM, SEWER,WATER <br /> SP—161 <br />