My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Supplement 8-02.3 by adding the following: <br /> 8-02.3(17) Landscape Restoration <br /> Restore all disturbed areas to original condition or better. The Contractor is specifically <br /> reminded that unnecessary damage caused beyond the limits of clearing or <br /> construction shall be repaired in like or better condition at the Contractor's sole <br /> expense. <br /> 8-02.4 Measurement <br /> Delete all paragraphs in 8-02.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-02.5 Payment <br /> Delete all paragraphs in 8-02.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-04 CURBS, GUTTERS AND SPILLWAYS <br /> ' 8-04.1 Description <br /> Revise the first paragraph in 8-04.1 to read as follows: <br /> ' This work shall consist of construction of cement concrete curbs. curbs and gutters, <br /> gutters, and HMA asphalt Curbs in accordance with 8-04 of the Standard <br /> Specifications and as modified in these Special Provisions conforming to the Plans and <br /> COE Standard Drawings. <br /> 8-04.2 Materials <br /> Supplement 8-04.2 by adding the following: <br /> Liquid Membrane-Forming Concrete <br /> 9-23.2 Special Provisions <br /> Curing Compounds <br /> Chemical Admixtures for Concrete 9-23.6 Special Provisions <br /> 8-04.3 Construction Requirements <br /> 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways <br /> Supplement 8-04.3(1) by adding the following: <br /> Provide steel forms on tangent sections and wooden forms for curved sections <br /> and radii. <br /> Provide 1/2-inch premolded filler in lieu of 3/8-inch premolded filler for through- <br /> expansion. Provide through expansion joint at maximum 30-foot intervals. <br /> Provide through expansion joint at each end of driveway. <br /> Compact the subbase for curb and gutter sections to 95-percent maximum density <br /> at optimum moisture content before placing the curb and gutter. <br /> The top surface of the finished concrete shall not deviate more than 1/8-inch as <br /> measured using a 10-foot straight edge. <br /> The curb alignment shall not vary more than 1/4-inch as measured using a 10-foot <br /> straight edge. <br /> Alverson Stormwater Separation Division 8-MISC CONSTRUCTION February, 2019 <br /> WO No. -UP3660 SP-167 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.