My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> I the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be <br /> typed or entered in ink. <br /> BID SCHEDULE <br /> IBIDDER: <br /> IITEM PLAN I TEM DESCRIPTION UNIT PRICE TOTAL <br /> NO. QUANTITY AMOUNT <br /> I <br /> 1 1 LS MOBILIZATION <br /> 2 1 LS SURVEYING <br /> 1 3 1 LS CONTRACTOR'S LIAISON <br /> I4 2,400 HR TRAFFIC CONTROL LABOR <br /> 5 1 LS MAINTENANCE AND PROTECTION <br /> OF TRAFFIC CONTROL <br /> 1 6 1 LS TRENCH EXCAVATION SAFETY <br /> SYSTEMS <br /> 7 150 HR STREET CLEANING AND SWEEPING <br /> 1 LS EROSION/WATER POLLUTION <br /> CONTROL <br /> 1 9 8,480 LF SAWCUT EXISTING IMPROVEMENTS <br /> 10 3.781 TON CRUSHED SURFACING BASE <br /> COURSE <br /> 11 3,512 TON GRAVEL BORROW <br /> I 12 200 TON FOUNDATION MATERIAL <br /> I <br /> 13 I LS TEMPORARY ROADWAY PATCH <br /> I14 92 LF STORM DRAIN PIPE, 6-INCH DIA <br /> 111 <br /> 15 590 LF STORM DRAIN PIPE, 8-INCH DIA <br /> 16 1,652 LF STORM DRAIN PIPE, 12-INCH DIA <br /> I17 1,583 LF STORM DRAIN PIPE, 18-INCH DIA <br /> 1 18 24 EA INLET <br /> 19 5 EA CATCH BASIN, TYPE 1 <br /> I20 7 EA CATCH BASIN, TYPE 1L <br /> Alverson Stormwater Separation Division P—PROPOSAL February 2019 <br /> IWork Order No.— UP3660 SP—15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.