My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> ITEM PLAN TOTAL <br /> NO. QUANTITY ITEM DESCRIPTION UNIT PRICE AMOUNT <br /> 21 23 EA CATCH BASIN, TYPE 2, 48-INCH DIA <br /> CEMENT CONCRETE PAVEMENT <br /> 22 140 SY BASE TYPE III(H.E.S.)FOR TRENCH <br /> PATCH <br /> HMA, CL 1/2"PG 64-22 FOR <br /> 23 785 TON PERMANENT TRENCH PATCH <br /> 24 287 SY TEMPORARY ASPHALT SIDEWALK <br /> AND CURB <br /> CONCRETE SIDEWALK <br /> 273 SY RESTORATION <br /> 26 211 SY CONCRETE DRIVEWAY <br /> RESTORATION <br /> 27 700 LF CONCRETE CURB & GUTTER, TYPE <br /> A-1 <br /> 28 10 LF CONCRETE CURB, TYPE E-1 , <br /> 29 25 LF EXTRUDED ASPHALT CURB <br /> 30 1 FA FORCE ACCOUNT , <br /> TOTAL BID $ ' <br /> The bid items above are described further in Division B-Bid items Descriptions. <br /> Note: This project is associated with storm water and combined sewer system work and Section 1-07.2(2) <br /> State Sales Tax—Rule 171 of the Special Provisions is applicable for the payment of sales tax. The <br /> Contractor shall include Washington State Retail Sales Taxes in the various unit bid item prices, including <br /> those that the Contractor pays on the purchase of materials, equipment, or supplies used or consumed in <br /> doing the Work. <br /> I <br /> I <br /> Alverson Stormwater Separation Division P—PROPOSAL February 2019 <br /> Work Order No.— UP3660 SP—16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.