Laserfiche WebLink
r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> ITEM PLAN TOTAL <br /> NO. QUANTITY ITEM DESCRIPTION UNIT PRICE AMOUNT <br /> 21 23 EA CATCH BASIN, TYPE 2, 48-INCH DIA <br /> CEMENT CONCRETE PAVEMENT <br /> 22 140 SY BASE TYPE III(H.E.S.)FOR TRENCH <br /> PATCH <br /> HMA, CL 1/2"PG 64-22 FOR <br /> 23 785 TON PERMANENT TRENCH PATCH <br /> 24 287 SY TEMPORARY ASPHALT SIDEWALK <br /> AND CURB <br /> CONCRETE SIDEWALK <br /> 273 SY RESTORATION <br /> 26 211 SY CONCRETE DRIVEWAY <br /> RESTORATION <br /> 27 700 LF CONCRETE CURB & GUTTER, TYPE <br /> A-1 <br /> 28 10 LF CONCRETE CURB, TYPE E-1 , <br /> 29 25 LF EXTRUDED ASPHALT CURB <br /> 30 1 FA FORCE ACCOUNT , <br /> TOTAL BID $ ' <br /> The bid items above are described further in Division B-Bid items Descriptions. <br /> Note: This project is associated with storm water and combined sewer system work and Section 1-07.2(2) <br /> State Sales Tax—Rule 171 of the Special Provisions is applicable for the payment of sales tax. The <br /> Contractor shall include Washington State Retail Sales Taxes in the various unit bid item prices, including <br /> those that the Contractor pays on the purchase of materials, equipment, or supplies used or consumed in <br /> doing the Work. <br /> I <br /> I <br /> Alverson Stormwater Separation Division P—PROPOSAL February 2019 <br /> Work Order No.— UP3660 SP—16 <br />